Duplex Home: Load Calculation

No account needed to calculate. Log in only when you want to save the project or download the PDF. Login Register
Code editionNEC 2023NEC 2026 New

NEC 2026: load calculations are in Article 120 (formerly Article 220). Use it only where the 2026 NEC is adopted.

Duplex Home Load Calculation

Service Details
Service
NEC 2026: each dwelling unit feeder per 120.82 (optional method). The service for both units per 120.85: the lesser of the Part III standard method and three identical units per 120.84 (optional method, 45%). A duplex has exactly 2 dwelling units.
Single-phase, 3-wire service (120.82(A)).
Common-area loads (exterior lighting, irrigation, etc.), added at 100%. Supplied from a separate house panel, not from either dwelling unit's panel (NEC 2026 210.25(B)). 0 if none.