Panel Schedule

How do you want to build this panel schedule?

1Load Calculation

Single-family dwelling, NEC 2023 §220.82 Optional Method. Calculating fills the panel schedule below with balanced circuits and sets the main breaker and bus rating.

Service & General Loads §220.82(B)(1)–(2)

Fixed Appliances (nameplate VA) §220.82(B)(3)

Cooking, Laundry & Water Heating (nameplate VA) §220.82(B)(3)

Heating & Cooling §220.82(C), largest applies

EV Charging 100%, outside the demand factor

Energy Storage Ready 2025 California Energy Code §150.0(s)

Refrigerator, lighting near the primary egress, a bedroom receptacle circuit and a kitchen small-appliance circuit. 100 A service: marked in the main panel. Above 100 A: placed in a 100 A ESS subpanel fed by a 60 A, 2-pole breaker.
2Panel Info
3Circuits (Zig-Zag Numbered)
#
Load (Left/A side)
VA
Circuit Breaker
Poles
#
Load (Right/B side)
VA
Circuit Breaker
Poles