NEC 2023 Code Guide

Plain-language answers for residential and commercial electrical design.

Part A · Fundamentals
1

Using the NEC

Article 90 · 90.3 · 90.4ResidentialCommercial
Meter bank and main switchboard installed in a building recessService and metering equipment

The NEC is the minimum safety rulebook for electrical work in the U.S. Each state or city adopts it, sometimes with changes.

Ch. 1–4General rules for every job
Ch. 5–7Special places and equipment can change them
AHJThe inspector has the final word
Show details, tables and figures

The NEC is a minimum safety standard. It is not a design manual, and it does not guarantee an efficient or expandable installation (90.1). Good design usually goes beyond the code minimum.

Chapters 1–4 General rules: apply to all installations Chapters 5, 6, 7 Special occupancies, equipment, conditions supplement / modify Chapter 8 Communications systems (stand-alone) Chapter 9: Tables Raceway fill, conductor properties Informative Annexes A–K Guidance only, not enforceable Article 100 All definitions (consolidated in 2023)
Figure 1-1. Code arrangement (90.3). Chapters 5–7 can change the general rules in Chapters 1–4.
Wording / itemMeaning
“shall” / “shall not”Mandatory rule.
“shall be permitted”Permissive rule: an allowed option, not a requirement.
ExceptionA specific condition where the main rule is changed or does not apply. Always read every exception.
Informational NoteExplanation or reference. It is not enforceable.
Numbering210.8(A)(1) = Article 210, Section 8, subsection (A), list item (1).
AHJ (90.4)The authority having jurisdiction, usually the electrical inspector. The AHJ interprets the code, approves equipment, and may grant special permission.

Recommended review sequence for a project

  1. Confirm the adopted edition and local amendments. Many jurisdictions lag one cycle behind, or modify rules such as 210.8 and 210.12.
  2. Identify the occupancy and any Chapter 5–7 articles that apply: 517 (health care), 518 (assembly), 500–516 (hazardous locations), 680 (pools), 690/705 (PV), 625 (EV), 700–702 (emergency/standby).
  3. Apply Chapters 1–4 for the general design: loads, conductors, OCPDs, grounding, wiring methods.
  4. Check product listings and installation instructions (110.3(B)). They are enforceable.
Related codesThe NEC works together with the building code (IBC/IRC), the energy code (IECC/ASHRAE 90.1: lighting controls, voltage drop), NFPA 70E (electrical safety in the workplace), and NFPA 72 (fire alarm). Check all of them in design reviews.
2

Key Definitions

Article 100ResidentialCommercial
Multifamily building with service equipment and meter bankService equipment at a multifamily building

Learn the key words first. Many rules depend on whether the wires are a service, a feeder, or a branch circuit.

ServiceUtility to main disconnect
FeederPanel to panel
BranchLast breaker to outlet
3 hoursMakes a load continuous
Show details, tables and figures

Since the 2023 edition, all definitions are consolidated in Article 100. Using the correct term matters: many rules depend on whether a conductor is a service, feeder, or branch circuit.

Utility xfmr Service equipment Panel- board Outlet SERVICE Art. 230 FEEDER Art. 215 BRANCH CIRCUIT Art. 210
Figure 2-1. Service, feeder, and branch circuit. Each is governed by its own article.
TermMeaning
AmpacityThe maximum current a conductor can carry continuously under its conditions of use without exceeding its temperature rating.
ServiceThe conductors and equipment that deliver energy from the serving utility to the premises wiring system.
FeederAll circuit conductors between the service equipment (or a separately derived system, or other source) and the final branch-circuit overcurrent device.
Branch circuitCircuit conductors between the final overcurrent device and the outlet(s).
Grounded conductorA system conductor that is intentionally grounded, typically the neutral (white or gray). It carries normal load current.
Equipment grounding conductor (EGC)The conductive path (green, bare, or a qualifying metal raceway) that connects equipment enclosures to the system grounded conductor and/or the grounding electrode conductor. It carries current only during a fault.
Grounding electrode conductor (GEC)The conductor between the system/equipment and the grounding electrode (rod, water pipe, building steel, concrete-encased electrode).
BondingConnecting metal parts to establish electrical continuity and conductivity.
Continuous loadA load where the maximum current is expected to continue for 3 hours or more.
Readily accessibleReachable quickly for operation, renewal, or inspection, without tools (other than keys), climbing, or removing obstacles.
Qualified personA person with the skills and knowledge for the equipment and its operation, who has received safety training to recognize and avoid the hazards involved.
Dwelling unitA single unit with independent living facilities, including permanent provisions for living, sleeping, cooking, and sanitation. Many “dwelling” rules (210.8(A), 210.12(A), 210.52) depend on this definition.
Separately derived systemA premises system supplied from a source other than the service, with no direct connection to the supply conductors of another system except through grounding/bonding. A typical example is a 480–208Y/120 V transformer.
Common error“Grounded conductor” (neutral) and “grounding conductor” (EGC) are different conductors. They are connected only at the service (main bonding jumper) or at a separately derived system (system bonding jumper), never downstream.
3

General Requirements for Electrical Installations

110.3 · 110.9 · 110.10 · 110.14 · 110.16 · 110.24ResidentialCommercial
Switchboard nameplate showing 75 C wire, torque values and 42,000 A short-circuit ratingNameplate: 75°C wire, torque values, 42 kA SCCR

Basic rules for all equipment: install it per its listing, respect terminal temperatures, and label large commercial gear.

75°CTypical terminal rating; the lowest rating in the circuit governs
AICBreakers must handle the available fault current
1000 A+Arc-flash label with fault current and clearing time
Show details, tables and figures

Article 110 sets the ground rules that apply to all equipment. Several of these items are frequent plan-review and inspection comments on commercial projects.

3.1 Termination temperature limits: 110.14(C)

A conductor may be insulated for 90°C (e.g., THHN), but the terminal it lands on may be rated only 60°C or 75°C. The lowest-rated component in the circuit (conductor, terminal, or device) sets the usable ampacity column.

Breaker lug 75°C THHN conductor insulation 90°C Size from the 75°C column
Figure 3-1. The lower rating governs.
CircuitColumn to use
≤ 100 A, or 14–1 AWG60°C, unless the equipment is listed and marked for 75°C (most modern equipment is marked 60/75°C)
> 100 A, or larger than 1 AWG75°C
90°C columnOnly as the starting value for ampacity correction/adjustment. The final result may not exceed the termination rating.

Torque (110.14(D)): where the manufacturer gives a tightening torque, use a calibrated torque tool. Loose connections are a leading cause of electrical fires.

3.2 Interrupting rating and short-circuit current rating: 110.9, 110.10

  • Interrupting rating (AIC): every breaker and fuse must be able to safely interrupt the available fault current at its line terminals. Residential breakers are commonly 10 kA. Commercial services near large utility transformers often need 22 kA, 42 kA, 65 kA, or more.
  • SCCR: equipment such as panelboards, motor controllers, HVAC units (440.10), and industrial control panels (409.22) must have a short-circuit current rating that is not less than the available fault current.
  • Series-rated combinations (240.86) must be tested and marked, and in some cases engineered by a licensed professional.

3.3 Field markings for commercial equipment

SectionRequirementApplies to
110.16(A)Arc-flash warning label on switchboards, switchgear, panelboards, meter socket enclosures, and motor control centers likely to be examined, adjusted, serviced, or maintained while energized.Commercial
110.16(B)For service equipment and feeder-supplied equipment rated 1000 A or more, a permanent label showing nominal voltage, available fault current, OCPD clearing time, and the date of the label. Alternatively, a label meeting NFPA 70E arc-flash labeling.Commercial
110.21(B)Field-applied hazard markings must be permanent, durable, and suitable for the environment (ANSI Z535.4 style recommended).Res Com
110.24Service equipment in other than dwelling units must be field-marked with the maximum available fault current and the date of the calculation. Re-mark it when conditions change.Commercial
110.15The high leg of a 4-wire delta system (208 V to ground) must be marked orange.Commercial
210.5(C), 215.12(C)Where more than one nominal voltage system exists (e.g., 480Y/277 and 208Y/120), ungrounded conductors must be identified by phase and system, and the identification method must be posted at each panelboard.Commercial
Industry color convention (not an NEC requirement)208Y/120 V: black, red, blue. 480Y/277 V: brown, orange, yellow. Neutral: white (208Y/120) and gray (480Y/277). Follow the project specification.
4

Working Space About Electrical Equipment

110.26 · Table 110.26(A)(1) · 240.24ResidentialCommercial
Electrical room with disconnects and a clear aisle to the doorElectrical room: clear space and exit

Keep a clear space in front of panels so a worker can stand, move back, and get out fast. Never store anything there.

3–5 ftDepth, by voltage and what is opposite
30 inMinimum width
6½ ftMinimum headroom
6 ftDedicated space above: no pipes or ducts
Show details, tables and figures

110.26 protects the person working on energized equipment. It requires a clear area to stand, room to move back, enough light, and a way out. It has two separate parts that are often confused:

  • Working space (110.26(A)): the clear area in front of the equipment, for people.
  • Dedicated equipment space (110.26(E)): the zone directly above and below switchboards, switchgear, panelboards, and MCCs, kept free of foreign systems (pipes, ducts).

The working-space dimensions apply to equipment operating at 1000 V or less to ground that is likely to require examination, adjustment, servicing, or maintenance while energized. Examples are panelboards, switches, circuit breakers, controllers, VFDs, and controls on HVAC equipment. “Examination” includes checking for the presence of voltage with a meter.

Equipment not likely to be worked on while energizedThe minimum dimensions of Table 110.26(A)(1) are not mandatory for equipment that is not likely to be examined or serviced while energized. However, the opening paragraph of 110.26 still requires access and working space sufficient for safe operation and maintenance. Most panels, disconnects, and controls are treated as “likely”, so design for full clearances.
WORKING SPACE Depth: 3–5 ft 6½ ft min SIDE VIEW PANEL 30 in min (or equip. width) FRONT VIEW
Figure 4-0. The working space is a clear “box” in front of the equipment: depth per Table 110.26(A)(1) × width of 30 in or the equipment width × height of 6½ ft or the equipment height, whichever is greater in each case.

4.1 Depth: 110.26(A)(1)

Depth is measured from the exposed live parts, or from the front of the enclosure (or its opening) if live parts are enclosed. The required depth depends on the voltage to ground and on what is on the opposite side of the space (the “condition”).

Table 110.26(A)(1): minimum depth of clear working space
Nominal voltage to groundCondition 1Condition 2Condition 3
0–150 V900 mm (3 ft)900 mm (3 ft)900 mm (3 ft)
151–600 V900 mm (3 ft)1.0 m (3½ ft)1.2 m (4 ft)
601–1000 V900 mm (3 ft)1.2 m (4 ft)1.5 m (5 ft)
Panel D Open, or no live / grounded parts (or insulated) Condition 1 Panel D Grounded surface: concrete, brick, tile, metal Condition 2 Panel D Exposed live parts on both sides Condition 3
Figure 4-1. Plan views of Conditions 1, 2, and 3. The gray hatched area is the required clear working space; D = required depth from Table 110.26(A)(1).
Voltage to ground, not line-to-line voltage
  • 120/240 V single-phase and 208Y/120 V: 120 V to ground, so the row is 0–150 V and the depth is 3 ft in all conditions.
  • 480Y/277 V: 277 V to ground, so the row is 151–600 V and the depth is 3, 3½, or 4 ft.
  • 240 V delta with a high leg: 208 V to ground, so the row is 151–600 V.

Depth: special provisions

  • Dead-front assemblies, 110.26(A)(1)(a): working space is not required at the back or sides where all connections and renewable or adjustable parts are accessible from the front. Where rear access is needed for work on de-energized parts, provide at least 30 in horizontally.
  • Low voltage, 110.26(A)(1)(b): smaller spaces are permitted by special permission where exposed live parts operate at no more than 30 V rms, 42 V peak, or 60 V dc.
  • Existing buildings, 110.26(A)(1)(c): where equipment is replaced, Condition 2 spacing is permitted between dead-front switchboards, panelboards, or MCCs facing each other across an aisle, if written procedures prevent both sides from being open at the same time and only authorized, qualified persons service the installation.

4.2 Width: 110.26(A)(2)

The working space must be at least 30 in (762 mm) wide or the width of the equipment, whichever is greater. Equipment doors and hinged panels must be able to open at least 90°.

WALL (plan view) Panel door at 90° Working space ≥ 30 in or equipment width D
Figure 4-2. The 30-in zone does not have to be centered on the equipment; it may extend to one side.

Practical points

  • The 30 in may be measured left-to-right, right-to-left, or centered on the equipment. Working spaces of neighboring equipment may overlap.
  • 2023: open equipment doors must not impede access to or egress from the working space. Access is considered impeded if one or more doors opened at the same time leave a path less than 24 in wide or 6½ ft high.
  • A water heater, laundry sink, shelving, or the door swing of a room may not intrude into the space.
  • Measure from the front face of a surface-mounted panel, not from the wall behind it.
  • Equipment located in a hallway or corridor (common in schools and offices) needs the full depth, measured to the opposite wall (usually Condition 2 at 480Y/277 V).

4.3 Height: 110.26(A)(3)

SIDE VIEW · FLOOR ◀ Panel front ≤ 6 in past panel front Box above 6½ ft min (or equipment height if taller) Depth per table VIOLATION conduit sticks out more than 6 in > 6 in
Figure 4-3. Height of the working space and the 6-in rule. Boxes, wireways, raceways, or transformers above or below the panel may extend no more than 6 in past the panel front. Here the conduit from the bottom of the panel swings out more than 6 in into the working space, which is a violation. Keeping it tight to the wall would be correct.

The working space must be clear from the grade, floor, or platform up to 6½ ft (2.0 m), or to the height of the equipment if it is taller.

Electrical equipment that belongs to the installation (boxes, wireways, raceways, transformers, supports) may be located above or below the equipment inside this height. It may extend no more than 6 in (150 mm) beyond the front of the equipment.

Example: panel front 4 in from the wall
  • A box above it 10 in from the wall sticks out 6 in past the panel: permitted.
  • A box above it 12 in from the wall sticks out 8 in past the panel: not permitted.
  • Concrete housekeeping pads under switchboards are treated like other equipment: they may extend no more than 6 in beyond the front of the equipment.
  • Existing dwelling units: the minimum height does not apply to a service disconnect or panelboard rated 200 A or less.
  • Meters: meters are permitted to be installed in the required working space.

4.4 Limited access, separation, and floor surface: 110.26(A)(4)–(A)(6)

ItemRequirement
(A)(4) Limited accessFor equipment above a suspended ceiling or in a crawl space:
  • An access opening of at least 22 × 22 in (ceiling) or 22 × 30 in (crawl space).
  • A working space at least 30 in wide, or the width of the equipment if greater.
  • Enclosure doors and hinged panels able to open at least 90°.
  • The full depth from Table 110.26(A)(1) in front of the equipment, unobstructed to the floor by fixed cabinets, walls, or partitions (clarified in 2023).
  • A horizontal, weight-bearing ceiling structural member may be in this space if it does not force a side reach of more than 6 in to work in the enclosure.
(A)(5) Separation from high-voltage equipmentWhere equipment rated 1000 V or less is in a room or vault with exposed live parts or wiring over 1000 V, the high-voltage equipment must be separated from the low-voltage working space by a suitable partition, fence, or screen.
(A)(6) Grade, floor, or platformThe surface of the working space must be as level and flat as practical over the entire required depth and width. A sloped sidewalk, curb, step, or landscaping inside the space is a common outdoor violation.

4.5 Clear spaces: 110.26(B)

  • The working space may not be used for storage, at any time. This is one of the most common citations in occupied buildings.
  • If normally enclosed live parts are exposed for inspection or servicing in a passageway or general open area, the working space must be suitably guarded.

4.6 Entrance to and egress from working space: 110.26(C)

A worker injured by an arc flash must be able to get out quickly, without being trapped behind large equipment. The rules depend on the size and rating of the equipment.

PLAN VIEW · ELECTRICAL ROOM Switchboard ≥ 1200 A, over 6 ft wide (contains OCPDs, switching or control devices) Working space width = switchboard width · depth D per table EXIT EXIT Entrance at each end ≥ 24 in wide × 6½ ft high ≤ 25 ft from nearest edge of working space Personnel door (equipment ≥ 800 A): opens in direction of egress (out), listed panic or fire-exit hardware
Figure 4-4. 110.26(C)(2) and (C)(3): an entrance at each end of the working space, and the personnel-door requirements. The door swings out of the room.
PLAN VIEW · SINGLE ENTRANCE, 110.26(C)(2)(b) Switchboard 1200 A or more Switchboard 1200 A or more Depth = 2 × D (doubled working space) X ≥ D X ≥ D Single entrance (swings out) Measure X to the door jamb, not the door swing
Figure 4-5. One entrance is permitted when the working-space depth is doubled. X, from the equipment to the nearest edge of the entrance, must be at least D from Table 110.26(A)(1). Example: at 208Y/120 V, D = 3 ft, so the depth is 6 ft and X ≥ 3 ft.
ItemRequirement
110.26(C)(1)All equipment: at least one entrance of sufficient area to give access to and egress from the working space.
110.26(C)(2)Large equipment containing overcurrent devices, switching devices, or control devices: one entrance at least 24 in wide × 6½ ft high at each end of the working space. This applies to either:
  1. Feeder equipment rated 1200 A or more and over 6 ft (1.8 m) wide; or
  2. Multiple service disconnects grouped per 230.71(B) with a combined rating of 1200 A or more and a combined width over 6 ft (clarified in 2023). Example: four 400 A disconnects in a row.
110.26(C)(2)(a)Unobstructed egress: a single entrance is permitted where the location permits a continuous and unobstructed way of egress travel.
110.26(C)(2)(b)Extra working space: a single entrance is permitted where the working-space depth is twice the value in Table 110.26(A)(1). The entrance must be located so the distance from the equipment to the nearest edge of the entrance is at least the Table 110.26(A)(1) depth (Figure 4-5).
110.26(C)(3)Personnel doors: where equipment rated 800 A or more with overcurrent, switching, or control devices is installed, any personnel door intended for entrance to and egress from the working space and located within 25 ft of the nearest edge of the working space must open at least 90° in the direction of egress (the 90° minimum is new in 2023). It must also have listed panic hardware or listed fire-exit hardware.
Points that are often misread
  • The 800 A door rule depends only on the equipment rating, not its width. It applies to the room door even when two exits are not required.
  • The 25-ft distance is measured from the nearest edge of the working space to the door.
  • The door hardware must open by pushing. A knob or lever that must be turned is not acceptable, because an injured worker must be able to push the door open.
  • The “entrances” in (C)(2) are openings into the working space, at its ends. They are not necessarily room doors.

4.7 Illumination: 110.26(D)

Lighting is required for all working spaces about service equipment, switchboards, switchgear, panelboards, and motor control centers installed indoors.

  • The lighting may not be controlled by automatic means only. Timers or occupancy sensors are allowed if a manual means can turn the lights on.
  • Additional lighting outlets are not required where the working space is illuminated by an adjacent light source, or as permitted by 210.70(A)(1) Exception 1 for switched receptacles.

4.8 Dedicated equipment space: 110.26(E)

Switchboards, switchgear, panelboards, and motor control centers must be located in dedicated spaces and protected from damage. Exception: control equipment that, by its nature or because of other code rules, must be adjacent to or within sight of its machinery may be installed in those locations.

SIDE VIEW · FLOOR SWBD Working space 14 ft · Structural slab ALLOWED: pipe + drip pan above zone 12½ ft · Top of zone (6 ft above SWBD) NOT ALLOWED: pipe in zone, even above the ceiling tiles 9 ft · Suspended ceiling tiles permitted; not a structural ceiling 6½ ft · Top of switchboard Dedicated zone (shaded)
Figure 4-6. The dedicated electrical space is the footprint of the equipment, from the floor to 6 ft above the equipment or to the structural ceiling, whichever is lower. If the slab is less than 6 ft above the equipment, the zone goes all the way to the slab.
Not permitted in the zonePermitted
Water, drain, or condensate pipingElectrical raceways and cables, even ones not associated with that equipment
HVAC ducts; sprinkler piping run through the zoneSprinkler protection of the space (heads may spray the equipment), with the piping arranged to comply with (E)(1)(c)
Drip pans and other leak-protection apparatusSuspended ceiling with removable panels (Exception to (E)(1)(a))
Piping hidden above ceiling tiles but still within 6 ft of the equipmentForeign systems above the zone, with protection such as a drip pan (110.26(E)(1)(b))
  • (E)(1)(a) Dedicated electrical space: reserved exclusively for the electrical installation. This includes the space below the equipment down to the floor.
  • (E)(1)(b) Foreign systems: permitted above the dedicated space only if protection prevents damage from condensation, leaks, or breaks. A drip pan does not make a pipe inside the zone acceptable; both the pipe and the pan must be above it.
  • (E)(1)(d) Suspended ceiling: a dropped, suspended, or similar ceiling that adds no strength to the building structure is not a structural ceiling.
  • 2023 change: service equipment was added to the list of equipment that needs dedicated space, alongside switchboards, switchgear, panelboards, and MCCs. This keeps the 230.85 emergency disconnect accessible.
  • (E)(2) Outdoor: install in identified enclosures, protected from accidental contact by unauthorized personnel, from vehicular traffic, and from accidental spillage or leakage. The working-space zone must be kept free of architectural appurtenances and other equipment.
  • (E)(2)(c) Outdoor dedicated space: the equipment footprint from grade up to 6 ft above the equipment is reserved for the electrical installation. A gas pipe or water line run up the wall through this zone next to a meter or panel is a common violation. Exception: structural overhangs and roof extensions are permitted in the zone.

4.9 Locked electrical rooms: 110.26(F)

Electrical equipment rooms or enclosures housing equipment that are controlled by a lock are considered accessible to qualified persons.

Residential application

  • Panels in garages and basements: keep 30 in × 3 ft × 6½ ft clear. Watch for water heaters, freezers, shelving, and workbenches.
  • Panelboards may not be installed in clothes closets (240.24(D)), bathrooms (240.24(E)), or over the steps of a stairway (240.24(F)).
  • Breaker handles: the center of the operating handle in its highest position may be no more than 6 ft 7 in (2.0 m) above the floor (240.24(A), 404.8).
  • Do not run plumbing or HVAC ducts directly above the panel (dedicated space).

Commercial application

  • 480Y/277 V panels facing a concrete or block wall: 3½ ft (Condition 2). Panels facing each other across an aisle: 4 ft (Condition 3).
  • Electrical rooms: coordinate early with architects. Doors, door swings, and housekeeping pads affect clearance.
  • Check switchboards ≥ 1200 A for two exits, and doors for panic hardware (≥ 800 A).
  • Coordinate MEP routing so that sprinkler mains, ductwork, and plumbing stay out of the dedicated space.
  • Transformers, VFDs, and disconnects on rooftops and in mechanical rooms also need working space.
Frequent violations
  • Storage in front of panels (boxes, cleaning supplies, furniture).
  • Housekeeping pad or column intruding into the working space.
  • Using 3 ft for a 480 V panel facing a block wall (3½ ft required).
  • Condensate or plumbing lines in the dedicated space above a panelboard, including lines hidden above ceiling tiles.
  • Room lighting controlled only by an occupancy sensor.
  • Conduits or other equipment on the floor or wall projecting more than 6 in into the working space.
  • An outdoor working space on a sloped sidewalk or curb, so it is not level and flat (110.26(A)(6)).
  • An electrical room door that swings inward or has a knob instead of panic hardware, where the equipment is rated 800 A or more.
  • Large switchboards (≥ 1200 A, over 6 ft wide) with only one exit and no doubled working space.
Over 1000 VEquipment over 1000 V nominal follows 110.32–110.34, which has larger working-space depths and separate entrance requirements.
Part B · Branch Circuits & Outlets
5

Required Branch Circuits & Receptacle Outlets

210.11 · 210.52 · 210.62 · 210.63 · 406.9 · 406.12ResidentialCommercial
Finished dwelling kitchen with countertop receptaclesKitchen countertop receptacles: 24 in rule (210.52(C))

Homes need specific 20 A circuits and enough receptacles that nobody needs an extension cord.

6 ftMax from any wall point to a receptacle
24 inMax from any countertop point to a receptacle
2 × 20 AKitchen small-appliance circuits
25 ftService receptacle near HVAC equipment
Show details, tables and figures

For dwelling units, the NEC prescribes specific circuits and receptacle locations so occupants do not need extension cords. Commercial buildings have fewer prescriptive outlet rules, but several targeted requirements apply.

5.1 Required dwelling branch circuits: 210.11(C)

CircuitRequirement
Small-applianceAt least two 20 A circuits serving kitchen, pantry, breakfast, and dining room receptacles, including the countertops. They may not serve other outlets (with limited exceptions, e.g., a clock or gas-range ignition).
LaundryAt least one 20 A circuit for laundry receptacles, with no other outlets.
BathroomAt least one 20 A circuit for bathroom receptacles. Either one circuit for all bathrooms' receptacles, or one circuit per bathroom that may also feed other equipment in that same bathroom.
GarageAt least one 20 A circuit for receptacles in attached garages, and in detached garages with power. It may also serve readily accessible outdoor receptacles.

5.2 Dwelling receptacle locations: 210.52

Door ≤ 6 ft ≤ 12 ft between receptacles ≤ 12 ft No point along the floor line more than 6 ft from a receptacle
Figure 5-1. General wall spaces in habitable rooms (210.52(A)).
COUNTERTOP (wall) ≤ 4 ft apart ≤ 2 ft to end Every space ≥ 12 in wide needs a receptacle; no point more than 24 in from one
Figure 5-2. Kitchen wall countertops (210.52(C)(1)).
LocationRequirement (dwelling units)
Habitable rooms (A)6 ft / 12 ft rule. Wall spaces 2 ft or wider count, including fixed glass panels and fixed room dividers. Floor receptacles count only if within 18 in of the wall.
Countertops (C)(1)A receptacle for every wall countertop space 12 in or wider; no point more than 24 in from a receptacle, measured horizontally along the wall line.
Islands & peninsulas (C)(2)2023 change: receptacles are not required. If none is installed, provide for a future receptacle (e.g., a junction box or raceway).
Receptacle height (C)(3)No more than 20 in above the countertop. Receptacles may not be installed face-up in countertops unless listed for that use (406.5(E)).
Bathrooms (D)At least one receptacle within 3 ft of the outside edge of each basin, on an adjacent wall, the side or face of the basin cabinet, or a listed countertop assembly.
Outdoors (E)One- and two-family dwellings: at least one receptacle at the front and one at the back, readily accessible from grade and no more than 6½ ft above grade. Also one on each balcony, deck, or porch accessible from inside.
Laundry (F)At least one receptacle for the laundry area.
Basements, garages (G)At least one in each unfinished basement area and in each vehicle bay of a garage, no more than 5½ ft above the floor.
Hallways (H)At least one receptacle in hallways 10 ft or longer.
Foyers (I)Foyers larger than 60 ft²: a receptacle on each wall space 3 ft or wider.

5.3 Receptacle types

  • Tamper-resistant (406.12): required for 15 A and 20 A, 125 V and 250 V receptacles in dwelling units, hotel/motel guest rooms, child-care facilities, schools, business-office corridors and waiting rooms, clinics, places of awaiting transportation, gyms, auditoriums, dormitories, and assisted-living facilities. Exceptions include receptacles more than 5½ ft above the floor.
  • Weather-resistant with in-use covers (406.9(B)): required for 15 A and 20 A receptacles in wet locations. The cover must be an “extra-duty” in-use type.

5.4 Commercial receptacle requirements

SectionRequirement
210.62Show windows: at least one receptacle per 12 linear ft of show window, within 18 in of the top of the window.
210.63(A)HVAC equipment: a 125 V, 15 A or 20 A receptacle within 25 ft of heating, A/C, and refrigeration equipment, on the same level, and not on the load side of the equipment disconnect. This applies to rooftop units too.
210.63(B)Other electrical equipment (other than one- and two-family dwellings): a receptacle within 25 ft of indoor service equipment and of indoor equipment that requires dedicated equipment space (switchboards, panelboards, MCCs).
210.8(B), (E)Receptacles required by 210.63 are GFCI protected where they fall in a 210.8 location (e.g., rooftops, outdoors).
5A

Unit vs. Common-Area Circuits (Multiple Occupancy)

210.25 · 225.30 · 240.24(B)ResidentialCommercial
Multifamily meter bank with unit meters and service equipmentMeter bank: provide a house meter for common loads

In duplexes, apartments, and multi-tenant buildings, each unit's panel may feed only that unit. Anything shared (corridor and site lighting, fire alarm, gates) must come from a house (common) panel.

210.25(A)Unit circuits serve only that unit
210.25(B)Common areas: never from a unit panel
House meterOwner/HOA pays for and controls shared loads
225.30One supply per building
Show details, tables and figures

210.25 applies to two-family dwellings, multifamily dwellings, and multi-occupancy buildings such as retail centers and offices with tenants. It keeps one occupant from controlling, switching off, or paying for loads that everyone relies on.

5A.1 The rule: 210.25(A) and (B)

SectionRequirement
210.25(A) Dwelling unit circuitsBranch circuits in each dwelling unit may supply only loads within that unit, or loads associated only with that unit. Examples: its own entry light, its own patio receptacle, its own HVAC condenser.
210.25(B) Common area circuitsBranch circuits for lighting, central alarm, signal, communications, or other purposes for public or common areas may not be supplied from equipment that supplies an individual dwelling unit or tenant space.
240.24(B) Occupant accessEach occupant must have ready access to the overcurrent devices protecting the conductors that supply their own occupancy. Common circuits locked inside one unit's panel defeat this.
Duplex A Duplex B Shared drive aisle (common area) Unit 2 Unit 1 Unit 2 Unit 1 P2 P1 P2 P1 Unit-fed light facing aisle: NO Site light Site light HP House panel / house meter (may be in adjacent building) Green: unit panel → own entry light (OK) Dashed green: house panel → site lights (OK)
Figure 5A-1. A duplex motor court. Each unit's panel feeds only its own entry lights. The shared aisle is lit by site lights (pole lights, bollards, or other freestanding fixtures) fed from the house panel. A light that lights the aisle from a unit panel (red) violates 210.25(B).

5A.2 What counts as a common area

Residential (duplex, townhome, apartment)

  • Shared drive aisles and motor courts, shared walkways, side yards, stairs, and landings
  • Corridor, lobby, and exterior building lighting
  • Fire alarm panel, intercom, access control, gate operator
  • Common laundry, trash room, mail area, pool and spa equipment
  • Parking-lot and site lighting, irrigation controller

Commercial (multi-tenant)

  • Parking-lot and site lighting of a retail center
  • Shared restrooms, corridors, egress lighting
  • Landlord HVAC, fire alarm, elevators, booster pumps
  • Monument signs that identify the whole center

5A.3 Feeding from a house panel in another building: 225.30

A house panel in an adjacent building on the same property satisfies 210.25(B). However, where the light is mounted matters:

LayoutResult
Freestanding site lights (pole lights, bollards, or similar), fed from the house panelPreferred. These are site fixtures, not part of the duplex, so the duplex is still supplied only by its own service.
Lights mounted on the duplex walls, fed from the other building's house panelThis is a second supply to a building that already has a service. 225.30 permits only one feeder or branch circuit per building, except for listed special cases (fire pumps, emergency or standby, parallel power production, EV charging, docks). Common lighting is not one of them, so get written AHJ approval. If accepted, provide a disconnect at the building (225.31, 225.32), a plaque showing all supplies (225.37), and an equipment grounding conductor (250.32).

5A.4 Frequently asked questions

QuestionAnswer
Can common lights stay on a unit panel with an astronomical time clock and a breaker lock?No. 210.25(B) is about the source, not the controls. The circuit still goes dark if the unit's main trips or the utility disconnects that meter, the tenant still pays for it, and the owner or HOA cannot reach it. The time clock is still required for Title 24, but it must be on a common source.
Is a coach light at one unit's own garage door a common-area light?It is a gray area. A light serving only that unit's own garage door can be “associated only with that unit” (210.25(A)). It may stay on the unit panel if switched from inside that unit, and it must not be counted toward lighting of the shared aisle. Confirm with the AHJ.
What are the cheaper compliant options?
  1. Run one site-lighting circuit from an existing house or HOA meter (street lights, irrigation, gate, clubhouse).
  2. Add a house meter position to the meter bank already being purchased, with a small meter-main or a 6–12 circuit load center.
  3. Use solar-powered poles or bollards for the shared area (no connection to any panel).
  4. Limit unit lights to each unit's private entry and garage door, and do not rely on them for the shared area.
Suggested plan note“Exterior lighting serving shared drive aisles, walkways, and other common areas is supplied from the house panel (NEC 210.25(B)) and controlled by photocell and astronomical time clock. Each dwelling unit panel supplies only lighting associated with that unit's own entrances and private areas (NEC 210.25(A)).”
Common errors
  • One continuous exterior lighting circuit wrapping around a duplex, crossing the party wall from one unit's panel to the other unit's side.
  • Motor-court, corridor, or stair lighting fed from the nearest unit panel.
  • Fire alarm panel, gate operator, or irrigation controller fed from a unit or tenant panel.
  • Wall lights on one building fed from a house panel in another building without addressing 225.30.
6

Ground-Fault Circuit-Interrupter (GFCI) Protection

210.8 · 422.5 · 680ResidentialCommercial
Kitchen backsplash receptacleKitchen countertop receptacle: GFCI required

A GFCI trips in a fraction of a second when current leaks to ground, possibly through a person. It is required wherever water or earth is nearby.

≈ 5 mATrip level
HomeKitchens, baths, garages, outdoors, basements
BusinessKitchens, bathrooms, rooftops, outdoors
Show details, tables and figures

A GFCI compares the current on the hot conductor with the current returning on the neutral. If about 4–6 mA leaks to ground, for example through a person, it opens the circuit within a fraction of a second. GFCI protection is required where water, damp floors, or contact with earth increase the risk of shock.

Bathroomall receptacles Kitchenall receptacles (2023) Laundryarea Garage& accessory bldg Bedroom(AFCI) Living room(AFCI) Also: outdoors · basements · crawl spaces · within 6 ft of sinks, tubs, showers · boathouses
Figure 6-1. GFCI-protected receptacle locations in a dwelling unit (210.8(A)).

Residential 210.8(A)

125–250 V receptacles on single-phase circuits rated 150 V or less to ground, in:

  • Bathrooms
  • Garages and accessory buildings (floor at or below grade, not habitable)
  • Outdoors
  • Crawl spaces at or below grade
  • Basements, finished or unfinished
  • Kitchens: all receptacles (2023)
  • Within 6 ft of a sink, bathtub, or shower stall
  • Boathouses
  • Laundry areas
  • Indoor damp and wet locations

Commercial 210.8(B)

Single-phase receptacles ≤ 50 A and three-phase receptacles ≤ 100 A, rated 150 V or less to ground, in:

  • Bathrooms and locker rooms with showers
  • Kitchens and areas with a sink and food-prep or cooking provisions
  • Rooftops and outdoors
  • Within 6 ft of sinks, bathtubs, or showers
  • Indoor damp and wet locations
  • Garages, service bays, and similar areas (not showrooms)
  • Crawl spaces and unfinished basement areas
  • Laundry areas, aquariums, bait wells, and similar

Other GFCI requirements

SectionRequirement
210.8(D)Specific appliances listed in 422.5(A), such as dishwashers, vending machines, drinking-water coolers and bottle fillers, high-pressure spray washers, and tire inflation machines.
210.8(E)Receptacles installed for servicing HVAC equipment (210.63).
210.8(F)Dwelling outdoor outlets (not only receptacles) on single-phase circuits 150 V or less to ground and 50 A or less. This includes equipment such as A/C condensers. Lighting outlets are exempt (except those covered by 210.8(C)). The 2023 code included a time-limited exception for listed HVAC equipment, so confirm its status with the adopted edition and local amendments.
625.54All receptacles installed for EV charging.
680Pools, spas, hot tubs, and fountains have extensive additional GFCI rules.
Readily accessibleThe GFCI device (breaker or receptacle) must be readily accessible for testing and reset. A GFCI receptacle behind a refrigerator or dishwasher does not comply; use a GFCI breaker or a blank-face GFCI in an accessible location.
GFCI vs. GFPEA GFCI (about 5 mA) protects people. Ground-fault protection of equipment (GFPE, e.g., 230.95 at about 1200 A pickup) protects equipment from destructive arcing faults. They are not interchangeable.
7

Arc-Fault Circuit-Interrupter (AFCI) Protection

210.12ResidentialHotels / dorms
Dwelling unit load center with dead-front installedDwelling load center: AFCI / dual-function breakers

An AFCI detects dangerous arcing in damaged cords or loose connections and shuts the circuit off before a fire starts.

15/20 A120 V circuits in living areas
Most roomsBedrooms, living, kitchen, laundry, halls
DualOne breaker can give AFCI + GFCI
Show details, tables and figures

An AFCI analyzes the current waveform for the signature of arcing, caused for example by a damaged cord, a loose terminal, or a nail through a cable, and trips before a fire can start. A GFCI protects people from shock; an AFCI protects the building from fire.

Normal current Arcing current Arc signature detected: device trips Smooth sine wave: no trip
Figure 7-1. AFCIs recognize the irregular waveform produced by arcing.
SectionWhere required
210.12(A)Dwelling units: all 120 V, single-phase, 10 A, 15 A, and 20 A branch circuits supplying outlets or devices in kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, and similar rooms or areas.
210.12(B)Dormitory units: bedrooms, living rooms, hallways, closets, bathrooms, and similar rooms.
210.12(C)Guest rooms and guest suites of hotels and motels, and patient sleeping rooms in nursing homes and limited-care facilities.
210.12(D)Branch-circuit extensions or modifications in the areas above: provide AFCI protection (a combination AFCI breaker, or an outlet branch-circuit AFCI at the first outlet). Extensions of 6 ft or less that add no outlets or devices are exempt.

Methods of protection: 210.12(A)(1)–(6)

  • A listed combination-type AFCI breaker protecting the entire circuit. This is the most common method.
  • An outlet branch-circuit (OBC) AFCI at the first outlet, where the home run is in metal raceway (RMC, IMC, EMT), steel-armored cable (Type AC or MC), or is encased in 2 in of concrete.
  • Other listed system combinations, as permitted.
Design tipKitchens and laundry areas need both AFCI and GFCI protection. Specify dual-function (AFCI/GFCI) breakers to keep the device count down and avoid nuisance-trip troubleshooting between two devices.
8

Lighting Outlets, Switching & Luminaires

210.70 · 404.2 · 404.8 · 410.16ResidentialCommercial
Finished dwelling living area with a ceiling luminaireCeiling lighting outlet, wall-switch controlled (210.70)

Every room needs a switched light. Switch boxes need a neutral so smart controls can be added later.

1 per roomWall-switched lighting outlet
6 risersStairs need a switch at each level
6 ft 7 inMax height of switch handle
Show details, tables and figures

8.1 Required lighting outlets: 210.70

Residential 210.70(A)

  • At least one wall-switch-controlled lighting outlet in every habitable room, kitchen, and bathroom. In habitable rooms other than kitchens and bathrooms, a switched receptacle is permitted instead.
  • Hallways, stairways, attached garages, and detached garages with power.
  • The exterior side of each outdoor entrance or exit with grade-level access (not garage vehicle doors).
  • Stairways with six or more risers: a wall switch at each floor level and at each landing level that includes an entryway.
  • Attics, underfloor spaces, utility rooms, and basements used for storage or containing equipment that needs servicing: a switch at the point of entry.

Commercial 210.70(C)

  • Attics and underfloor spaces containing equipment that needs servicing: at least one lighting outlet, controlled by a wall switch or a listed occupancy sensor, at or near the equipment.
  • Working spaces at electrical equipment must be illuminated, and may not be controlled by automatic means only (110.26(D)).
  • Lighting controls, occupancy sensors, and daylighting are mainly governed by the energy code (IECC / ASHRAE 90.1), not the NEC.

8.2 Switches

  • Neutral at switch locations, 404.2(C): a grounded (neutral) conductor must be provided at most switch locations that serve habitable rooms, bathrooms, hallways, and stairways, so electronic controls and occupancy sensors can be installed later. There are limited exceptions (e.g., the raceway allows the neutral to be added later, or the switch serves a receptacle).
  • Mounting height, 404.8(A): the center of the operating handle in its highest position may be no more than 6 ft 7 in (2.0 m) above the floor or working platform.
  • Wet locations: switches must be in weatherproof enclosures (404.4). In bathtub or shower spaces, a switch is permitted only as part of a listed tub or shower assembly.

8.3 Luminaires in clothes closets: 410.16

Back wall · Floor Storage space 24 in deep (or shelf width if greater), up to 6 ft or highest rod CEILING (section view) Luminaire clearance Minimum clearance to storage space Surface incandescent or LED (enclosed source): 12 in Surface fluorescent or LED: 6 in Recessed incandescent or LED (enclosed source): 6 in Recessed fluorescent or LED: 6 in Not permitted: open or partially enclosed lamps, pendants
Figure 8-1. Clothes closet luminaire clearances (410.16). This applies to dwellings and any other occupancy with clothes closets.
Part C · Loads, Feeders & Services
9

Load Calculations

Article 220 (renumbered in 2023)ResidentialCommercial
Unit meter section at a residential buildingCalculated load sets the service and meter size

Add up the loads, apply the NEC demand factors, then pick the service or feeder size.

3 VA/ft²Home lighting load
1,500 VAEach kitchen or laundry circuit
180 VAEach commercial receptacle
7,200 WEV charger in the load calc
Show details, tables and figures

The load calculation sets the minimum size of feeders and services. Article 220 was reorganized in 2023, so section numbers from the 2017 and 2020 editions have moved. Use the 2023 numbers on new drawings.

1. Connected unit loads, VA/ft², appliances 2. Demand factors (Art. 220 tables) 3. Continuous × 125% where applicable 4. Amperes VA ÷ V (÷ 1.732 for 3φ) Then select service/feeder rating, conductors, and OCPD
Figure 9-1. General load calculation process.

9.1 Article 220 map (2023 numbering)

Article 220 has five parts. Pick the part that matches what you are sizing: a single branch circuit (Part II), or a feeder or service (Part III standard method, or Part IV optional method).

PartSectionsCoversGo to
I · General220.1 – 220.5Scope; other articles with their own load rules (Table 220.3); voltages to use and rounding9.4
II · Branch-circuit loads220.10 – 220.18Loads of individual outlets: receptacles at 180 VA (220.14(I)), signs, show windows, additions to existing installations (220.16), maximum loads on a circuit (220.18)9.4
III · Feeder & service: standard method220.40 – 220.61Lighting unit loads, demand factors, small-appliance and laundry circuits, appliances, dryers, ranges, motors, space heating, kitchen equipment, EV, noncoincident loads, neutral9.2, 9.3, 9.4
IV · Feeder & service: optional methods220.80 – 220.88Dwelling unit, existing dwelling, multifamily, two dwelling units, schools, existing installations (measured demand), new restaurants9.5
V · Farm loads220.100 – 220.103Farm dwellings and farm buildings9.5
Renumbered in 2023Article 220 was reorganized in the 2023 edition. For example, the dwelling lighting load is now 220.41 (formerly 220.12), and the lighting demand table is now Table 220.45 (formerly Table 220.42). Use the 2023 numbers on new drawings and calculations.

9.2 Dwelling unit: standard method

LoadValueSection
General lighting & general-use receptacles3 VA/ft² (outside dimensions, excluding open porches, unfinished spaces not adaptable for future use)220.41
Small-appliance circuits1,500 VA each (minimum 2)220.52(A)
Laundry circuit1,500 VA220.52(B)
Demand on the three items aboveFirst 3,000 VA at 100%; 3,001–120,000 VA at 35%; remainder at 25%Table 220.45
Fastened-in-place appliances (4 or more)75% of nameplate total (excluding ranges, dryers, space heating, A/C)220.53
Clothes dryer5,000 W or nameplate, whichever is larger220.54
Cooking appliancesTable 220.55. A single range of 12 kW or less = 8 kW (Column C)220.55
EV supply equipment7,200 W or nameplate, whichever is larger (new in 2023)220.57
Heating vs. A/CUse only the larger of the two noncoincident loads220.60
Largest motorAdd 25% of the largest motor220.50, 430.24
Optional method (220.82)For a dwelling served by a 120/240 V or 208Y/120 V, 100 A or larger service, the optional method usually gives a smaller result. Take the first 10 kVA of general loads at 100% and the remainder at 40%, then add the HVAC load per 220.82(C). For existing dwellings, use 220.83. For existing commercial buildings, 220.87 allows the use of one year of recorded maximum demand × 125%.

9.3 Non-dwelling (commercial) occupancies

General lighting unit loads (Table 220.42(A), excerpt)
OccupancyVA/ft²
Office1.3
Retail1.9
Restaurant1.5
School1.5
Hospital / health-care clinic1.6
Hotel / motel (guest areas)1.7
Warehouse1.2
Manufacturing facility2.2
Parking garage0.1

Other commercial loads

  • Lighting is a continuous load: multiply by 125% when sizing feeders and services.
  • Receptacles (220.14(I)): 180 VA per single or multiple receptacle on one yoke.
  • Receptacle demand (220.44): first 10 kVA at 100%, remainder at 50%.
  • Show windows (220.43(A)): 200 VA per linear foot.
  • Sign outlet (220.14(F), 600.5): 1,200 VA minimum per required sign circuit.
  • Commercial kitchen equipment (220.56): demand factors for 3 or more units.
  • Motors and HVAC: use nameplate or table values, plus 25% of the largest motor.
NoteThe energy code typically limits installed lighting power to well below the NEC unit loads. Even so, the NEC values are the minimum for feeder and service calculations, unless the AHJ accepts an energy-code-based calculation (220.42(B) in 2023 allows this under specific conditions).

9.4 Other sections you will need

SectionTopicKey point
220.3Other articlesTable 220.3 lists load rules found elsewhere: for example, motors (430), A/C (440), EV (625), signs (600), elevators (620).
220.5Voltages and roundingUse nominal system voltages (120, 120/240, 208Y/120, 240, 480Y/277, 480). Fractions of an ampere below 0.5 may be dropped.
220.14Other loads (branch circuits)Receptacles 180 VA per yoke (220.14(I)), sign outlets 1,200 VA (220.14(F)), and appliance or motor outlets at their nameplate rating.
220.16Additions to existing installationsCalculate new loads with the same Part II and III rules. Check spare capacity with 220.83 (dwellings) or 220.87 (other buildings).
220.18Maximum loadsA circuit's total load may not exceed its rating. Lighting with ballasts, drivers, or transformers is based on the units' ampere ratings, not lamp wattage.
220.51Fixed electric space heating100% of the total connected load. A smaller load may be used only where the heating units cannot all operate at once.
220.61Feeder and service neutralSize the neutral for the maximum unbalanced load. Ranges and dryers may be taken at 70%. A further 70% demand factor applies to the unbalanced load over 200 A, but not to nonlinear loads on 3-phase, 4-wire wye systems.
220.70, 750.30Energy management systems (EMS)Where an EMS per 750.30 limits feeder or service current, the loads it controls may be taken at the EMS maximum set point (220.70, new in 2023). The setpoint must be marked and protected from adjustment, and the EMS may not disconnect elevators, emergency lighting, hazardous-location ventilation, or health care essential systems (750.30(B)). EVSE may be sized at the EMS setting (625.42(A)). See Topic 9A.

9.5 Optional methods (Part IV) and farm loads (Part V)

SectionUse forHow it works
220.82New dwelling unit (service or feeder 100 A or more)First 10 kVA of general loads at 100%, remainder at 40%, plus the largest HVAC load per 220.82(C).
220.83Existing dwelling unit with added loadFirst 8 kVA at 100% and remainder at 40% when no heating or A/C is added. Different factors apply when heating or A/C is added.
220.84Multifamily: 3 or more unitsAllowed where each unit has electric cooking and electric heating, A/C, or both, and no unit is fed by more than one feeder. Apply Table 220.84 to the total connected load. House loads are added using Part III.
220.85Two dwelling unitsIf the Part III load for two units exceeds the 220.84 load for three identical units, the lower value may be used.
220.86SchoolsConnected load per ft²: first 3 VA/ft² at 100%, over 3 to 20 VA/ft² at 75%, remainder at 25%.
220.87Existing installations (any occupancy)Use the maximum demand from 1 year of utility data (or 30 days of continuous recording) × 125%, plus the new load.
220.88New restaurantsApply Table 220.88 to the total connected load. There are separate columns for all-electric and not-all-electric restaurants.
220.100 – 220.103Farms (Part V)Farm dwellings are calculated like other dwellings. Farm buildings use Table 220.102, and the total farm service uses Table 220.103.
Table 220.84 multifamily demand factors (excerpt)
Number of units3–56–78–1014–1524–2534–3646–5062 and over
Demand factor45%44%43%40%35%30%26%23%

See the worked examples for a complete dwelling and a small retail service calculation.

9A

Energy Management Systems (EMS)

Article 750 · 220.70 · 625.42(A) · 705.13

An EMS watches the current on a service or feeder and turns managed loads (EV chargers, water heaters, heat pumps) down or off so the limit is never exceeded. This lets you add load without upsizing the service.

220.70Use the EMS setpoint in the load calc, as a continuous load
160 ATypical setpoint on a 200 A service (160 × 125% = 200)
MarkedSetting, date, and loads labeled; “shall not be bypassed”
Never offElevators, emergency lighting, hazardous ventilation
Show details, tables and figures

Article 750 sets the safety rules for the EMS itself. 220.70 lets you use its setpoint in the service or feeder calculation. 625.42(A) and 705.13 apply the same idea to EV chargers and to solar and battery systems.

9A.1 How it works

EMS setpoint 160 A Other loads (measured) 150 A 0 A EV 10 A 200 A service Load calc (220.70): 160 A setpoint × 125% = 200 A → fits the 200 A service. If other loads rise to 160 A, the EMS cuts EV charging to 0 A (750.30(C)(1)). If the EMS itself fails, the controlled loads turn off (750.30(C)(2)).
Figure 9A-1. The EMS keeps total measured current at or below its setpoint. Managed loads get whatever capacity is left.

9A.2 Article 750 requirements

SectionRequirement
750.1 ScopeInstallation and operation of EMSs that monitor and control electrical loads or power sources.
750.6 ListingThe EMS must be listed in one of three ways: as a complete system, as a kit for field installation in switch or overcurrent device enclosures, or as individually listed components assembled as a system.
750.20 Alternate power sourcesAn EMS may not override controls that keep an alternate power source available for fire pumps (695), health care facilities (517), emergency systems (700), legally required standby (701), or critical operations power (708).
750.30(A) Load sheddingAn EMS may not override load-shedding controls that preserve minimum capacity for fire pumps, emergency, legally required standby, and critical operations power systems.
750.30(B) Disconnection of powerAn EMS may not disconnect power to:
  • elevators, escalators, moving walks, and stairway lift chairs
  • positive mechanical ventilation for hazardous (classified) locations
  • ventilation used to exhaust hazardous gas or to reclassify an area
  • circuits supplying emergency lighting
  • essential electrical systems in health care facilities
750.30(C)(1) Current setpointWhere used for load management, the EMS may never allow a branch circuit, feeder, or service to be overloaded. Its maximum current setpoint is the value used in the load calculation (220.70).
750.30(C)(2) MalfunctionMonitoring and controls must automatically stop current to the controlled loads if the EMS malfunctions (lost sensor, lost communication, controller fault, lost control power).
750.30(C)(3) SettingsAdjustable current settings must be protected by at least one of: a sealable cover, a cover or door that needs a tool, a locked door, or password protection limited to qualified persons.
750.30(C)(4) MarkingThe equipment supplying the controlled circuit, feeder, or service must be field-marked with the maximum current setting, the date of the calculation and setting, the loads and sources controlled, and the statement “The setting for the EMS current limiting feature shall not be bypassed.” Markings per 110.21(B).
750.50 DirectoryWhere an EMS controls power remotely, post a directory of the controlled devices and their circuits on the controller, disconnect, or overcurrent device enclosure.
Example field marking (750.30(C)(4))WARNING: EMS CURRENT LIMIT · Maximum current setting: 160 A · Calculated and set: [date] · Controls: EV charger 1, EV charger 2 · The setting for the EMS current limiting feature shall not be bypassed.

9A.3 Using an EMS in calculations

SectionRuleExample
220.70Where an EMS limits feeder or service current per 750.30, a single value equal to the EMS maximum setpoint may be used in the load calculation. The setpoint is treated as a continuous load.160 A setpoint × 125% = 200 A, which fits a 200 A service.
625.42(A)EV charging is a continuous load. With an EMS per 750.30, the EV load on the service or feeder is the maximum load the EMS permits. The EMS may be built into one charger or into a listed multi-charger (power-sharing) system, which must be marked.Two 48 A chargers sharing an 80 A limit: 80 × 125% = 100 A for the managed EV load.
705.13An EMS (power control system) complying with 750.30 may limit current on busbars and conductors supplied by solar, battery, or other interconnected sources.A PCS caps PV and battery output so the busbar meets the 705.12 limits without a panel upgrade.
220.87 + EMSFor an existing building, use the measured peak demand × 125%, then add new loads. Putting the new loads under an EMS keeps the total within the existing service rating.Adding EV chargers or heat pumps to an existing service without an upgrade.
Common errors
  • Using the EMS setpoint in the calculation without the 125% continuous-load factor.
  • Missing field marking or panel directory (750.30(C)(4), 750.50).
  • Setpoint adjustable by the occupant (no seal, tool, lock, or password).
  • Putting elevators, emergency lighting, or hazardous-location ventilation under EMS control.
  • Unlisted controller or current sensors not approved in the listing.
CaliforniaCALGreen allows an automated load management system (ALMS) to reduce the EV-ready electrical capacity required. The service and feeder sizing still follows 220.70 and Article 750.
10

Continuous Loads & Feeder Taps

210.19 · 210.20 · 215.2 · 215.3 · 240.21(B)ResidentialCommercial
Switchboard sections with feeder breakers in an electrical roomFeeder breakers sized at 125% for continuous load

Loads that run 3 hours or more need 25% extra breaker and wire capacity. Tap rules allow short, smaller conductors off a feeder.

125%Breaker and wire for continuous loads
10 ft tapAt least 1/10 of feeder breaker
25 ft tapAt least 1/3 of feeder breaker
Show details, tables and figures

10.1 The 125% rule

Standard circuit breakers are not rated to carry 100% of their rating continuously inside an enclosure. For loads that run 3 hours or more, both the conductor and the OCPD are sized at 125% of the continuous load plus 100% of the non-continuous load.

Continuous load 40 A × 1.25 Minimum rating 50 A 50 A breaker 8 AWG Cu (50 A @ 75°C) Minimum = Non-continuous × 1.00 + Continuous × 1.25
Figure 10-1. A 40 A continuous load needs a 50 A circuit.
  • Typical continuous loads: commercial lighting, EV chargers (625.42), electric water heaters (422.13), fixed space heating (424.4), process loads, and data equipment.
  • Exception: where the OCPD assembly is listed for 100% operation (common for large switchboard breakers), the continuous load may be taken at 100%.
  • The conductor must satisfy two separate checks: (1) ≥ 125% of the continuous load before any correction or adjustment; and (2) ≥ the load after correction and adjustment factors.

10.2 Feeder tap rules: 240.21(B)

Normally, conductors must be protected at the point where they receive their supply. The tap rules allow a smaller conductor to be connected to a larger feeder without its own OCPD at the tap point, if strict limits are met.

400 A Feeder protected at 400 A ≤ 10 ft OCPD 10-ft tap ampacity ≥ 1/10 × 400 = 40 A* ≤ 25 ft OCPD 25-ft tap ampacity ≥ 1/3 × 400 = 134 A
Figure 10-2. Feeder taps. *The 1/10 rule applies to field-installed taps that leave the enclosure.
Tap ruleKey conditions
10-ft tap, 240.21(B)(1)The tap ampacity must be at least the calculated load and at least the rating of the device it supplies. For field installations leaving the enclosure: at least 1/10 of the feeder OCPD rating, and enclosed in a raceway. Must terminate in a single OCPD.
25-ft tap, 240.21(B)(2)The tap ampacity must be at least 1/3 of the feeder OCPD rating. It must terminate in a single breaker or set of fuses that limits the load to the tap ampacity, and be protected from physical damage.
Transformer taps, 240.21(B)(3), (C)Special rules for primary-plus-secondary tap lengths (up to 25 ft total) and for transformer secondary conductors (10 ft, 25 ft, and outside conductors). See Section 24.
Outside taps, 240.21(B)(5)Unlimited length outdoors, if the tap terminates in a single OCPD that is part of, or adjacent to, the building disconnect.
11

Services

Article 230 · 310.12ResidentialCommercial
Main service disconnect and meter sectionService disconnect and metering section

The service brings utility power into the building. It has its own sizing, disconnect, and safety rules.

100 AMinimum one-family home service
6 maxService disconnects
OutdoorEmergency disconnect for homes
1000 AGround-fault protection at 480Y/277 V
Show details, tables and figures
Utility xfmr Meter Service disconnect SPD Distribution / panelboards Residential: min. 100 A (230.79(C)) · outdoor emergency disconnect (230.85) · SPD (230.67) Commercial: ≤ 6 disconnects (230.71) · GFPE ≥ 1000 A at 480Y/277 V (230.95) fault current marking (110.24) · arc energy reduction ≥ 1200 A (240.87)
Figure 11-1. Key service requirements by occupancy.
SectionRequirementApplies to
230.42Service-entrance conductors: ampacity ≥ 125% of continuous load + non-continuous load, after demand factors.Res Com
230.79Minimum service disconnect rating: 100 A for one-family dwellings; 60 A for other installations; 30 A or 15 A for limited loads.Res Com
230.70The service disconnect must be at a readily accessible location, either outside or inside nearest the point of entrance of the service conductors.Res Com
230.71A maximum of six service disconnects per service, each in a separate enclosure or in a switchboard section/compartment.Res Com
230.67Surge-protective device (Type 1 or Type 2) required for services supplying dwelling units, dormitory units, hotel/motel guest rooms and suites, and nursing-home patient sleeping rooms. Required also when the service equipment is replaced.Res Hotels
230.85Emergency disconnect for one- and two-family dwellings, at a readily accessible outdoor location, marked “EMERGENCY DISCONNECT”. The service disconnect, a meter disconnect, or another listed switch may serve this purpose.Residential
230.95Ground-fault protection of equipment for solidly grounded wye services over 150 V to ground (e.g., 480Y/277 V) with a disconnect rated 1000 A or more. Max pickup 1200 A; max 1 s delay at 3000 A. Performance testing is required (230.95(C)).Commercial
240.87Arc energy reduction where the breaker rating or highest trip setting is 1200 A or more: zone-selective interlocking, differential relaying, energy-reducing maintenance switch, active arc-flash mitigation, or an equivalent approved method.Commercial

Dwelling service and feeder conductors: the 83% rule (310.12)

For single-phase 120/240 V dwelling services and main feeders rated 100–400 A that carry the entire dwelling load, conductors may be sized at 83% of the service rating. This reflects the diversity of residential loads.

Service rating83% valueCopper (75°C)Aluminum (75°C)
100 A83 A4 AWG2 AWG
125 A104 A2 AWG1/0 AWG
150 A125 A1 AWG2/0 AWG
200 A166 A2/0 AWG4/0 AWG
225 A187 A3/0 AWG250 kcmil
300 A249 A250 kcmil350 kcmil
400 A332 A400 kcmil600 kcmil
Not for commercial workThe 83% rule applies only to dwelling services and main dwelling feeders. Commercial services and multifamily house-panel feeders are sized at full ampacity from Table 310.16.
12

Panelboards & Switchboards

Article 408ResidentialCommercial
Panelboard circuit directoryCircuit directory: every circuit identified (408.4)

Label every circuit clearly, protect each panel at its rating, and land one neutral per terminal.

Every circuitClear, specific directory
1 neutralPer terminal
≈ 25%Spare space recommended
Show details, tables and figures
SectionRequirement
408.4(A)Circuit directory: every circuit and circuit modification must be legibly identified by its clear, evident, and specific purpose. Spare positions must be marked. Descriptions may not depend on transient conditions of occupancy (e.g., “Bob's office”).
408.4(B)Source of supply: in other than one- and two-family dwellings, each switchboard and panelboard supplied by a feeder must be marked with the name of the equipment it is fed from.
408.36Each panelboard must be protected by an OCPD with a rating not greater than that of the panelboard (main breaker in the panel, or the feeder breaker upstream).
408.41Each grounded (neutral) conductor must terminate in an individual terminal. No doubling of neutrals under one screw.
408.37Panelboards in damp or wet locations must be in weatherproof enclosures, installed to prevent moisture accumulation.
408.43Panelboards may not be installed face-up.
408.55Minimum wire-bending space at the terminals. This matters when upsizing conductors for voltage drop.
Design practiceLeave about 20–25% spare breaker spaces and capacity in new panelboards for future loads, and provide panel schedules that show load, demand, phase balance, AIC rating, and the feeder source.
13

Voltage Drop

Informational Notes to 210.19 & 215.2ResidentialCommercial
Long run of cables along a corridor ceilingLong cable runs: verify voltage drop

Long wires lose voltage. Keep the drop small so lights and motors work properly.

3%Branch circuit or feeder
5%Feeder + branch total
2KIL/CMSingle-phase formula
Show details, tables and figures

The NEC recommends, in informational notes, a maximum drop of 3% for a branch circuit or feeder and 5% total for feeder plus branch circuit. These limits are not enforceable NEC rules, but energy codes (e.g., ASHRAE 90.1: 2% feeder / 3% branch) and project specifications often make them mandatory. A few NEC articles do set enforceable limits, such as 647.4(D) for sensitive electronic equipment and 695.7 for fire pumps.

Panel 120 V One-way length L, current I Load ≥ 116.4 V (3%) Voltage is lost along the conductor because of its resistance
Figure 13-1. Voltage drop on a long branch circuit.
Single-phase: VD = (2 × K × I × L) / CM Three-phase: VD = (1.732 × K × I × L) / CM K = 12.9 Ω·cmil/ft (copper), 21.2 (aluminum), at about 75°C I = load current (A) L = one-way length (ft) CM = conductor area in circular mils (Chapter 9, Table 8)
Conductor areas, Chapter 9 Table 8 (excerpt)
Size121086421/04/0
cmil6,53010,38016,51026,24041,74066,360105,600211,600
ExampleA 16 A load, 150 ft one way, 12 AWG Cu: VD = 2 × 12.9 × 16 × 150 ÷ 6,530 = 9.5 V (7.9%), which is too high. With 8 AWG: 3.75 V (3.1%). With 6 AWG: 2.4 V (2.0%), which is acceptable. When you upsize the phase conductors, you must also upsize the EGC proportionally (250.122(B)).
Part D · Conductors & Overcurrent Protection
14

Overcurrent Protection

240.4 · 240.6 · 240.24ResidentialCommercial
Feeder circuit breakers in new switchgearFeeder breakers in distribution switchgear

Breakers protect the wire. Small wires have fixed maximum breaker sizes you should memorize.

15 A14 AWG copper
20 A12 AWG copper
30 A10 AWG copper
800 ALimit for “next size up”
Show details, tables and figures

The basic rule (240.4) is that conductors are protected at their ampacity. Several important modifications follow.

14.1 Small conductor rule: 240.4(D)

14 AWG Cu 15 A 12 AWG Cu 20 A 10 AWG Cu 30 A Aluminum / copper-clad Al: 12 AWG: 15 A max 10 AWG: 25 A max Exceptions: motors, A/C, welders, etc. (240.4(G))
Figure 14-1. Maximum overcurrent protection for small conductors.

14.2 Next size up: 240.4(B)

Where the conductor ampacity does not match a standard OCPD rating, the next higher standard rating is permitted only if all of these apply:

  • The conductors do not supply a multioutlet branch circuit serving cord-and-plug-connected portable loads.
  • The ampacity does not match a standard rating.
  • The next higher standard rating does not exceed 800 A. Above 800 A, the conductor ampacity must be equal to or greater than the OCPD rating (240.4(C)).

14.3 Standard ratings: 240.6(A)

15, 20, 25, 30, 35, 40, 45, 50, 60, 70, 80, 90, 100, 110, 125, 150, 175, 200, 225, 250, 300, 350, 400, 450, 500, 600, 700, 800, 1000, 1200, 1600, 2000, 2500, 3000, 4000, 5000, 6000 A. (Fuses also: 1, 3, 6, 10, 601 A.)

14.4 Location: 240.24

  • Readily accessible, with the handle center no more than 6 ft 7 in (2.0 m) above the floor.
  • Occupants must have ready access to the OCPDs that protect their own circuits. In multi-tenant buildings, this is usually done by placing a panel in each tenant space.
  • Not in clothes closets, bathrooms of dwelling units and hotel guest rooms, or over stairway steps.
Selective coordinationSelective coordination (only the nearest upstream OCPD opens) is mandatory for emergency systems (700.32), legally required standby systems (701.32), critical operations power (708.54), elevators with multiple drives (620.62), and certain health-care systems. Elsewhere it is good practice.
15

Conductor Ampacity & Derating

Table 310.16 · 310.15(B) · 310.15(C)ResidentialCommercial
Many MC cables bundled together across ceiling joistsBundled cables: apply 310.15(C)(1) adjustment

Wire ampacity comes from Table 310.16, then is reduced for hot locations and many wires in one conduit.

75°CUsual column for final sizing
80%4–6 current-carrying wires in a conduit
+33°CRooftop conduit close to the roof
Show details, tables and figures

Table 310.16 gives ampacities for insulated conductors rated up to 2000 V: no more than three current-carrying conductors in a raceway, cable, or earth, at a 30°C (86°F) ambient. For other conditions, apply correction and adjustment factors.

Table 310.16 (90°C column) × Ambient 310.15(B)(1) × Bundling 310.15(C)(1) Allowable ≤ termination limit Result must not exceed the 60°C / 75°C value for the terminations (110.14(C))
Figure 15-1. Derating sequence.
Table 310.16, copper (excerpt), amperes
Size60°C75°C90°C
14 AWG15*20*25*
12 AWG20*25*30*
10 AWG30*35*40*
8 AWG405055
6 AWG556575
4 AWG708595
3 AWG85100115
2 AWG95115130
1 AWG110130145
1/0125150170
2/0145175195
3/0165200225
4/0195230260
250 kcmil215255290
350 kcmil260310350
500 kcmil320380430
Table 310.16, aluminum (excerpt), amperes
Size60°C75°C90°C
6 AWG405055
4 AWG556575
2 AWG7590100
1 AWG85100115
1/0100120135
2/0115135150
3/0130155175
4/0150180205
250 kcmil170205230
350 kcmil210250280
500 kcmil260310350
600 kcmil285340385

* OCPD limited by 240.4(D). Insulation types: 60°C = TW, UF; 75°C = THW, THWN, XHHW, USE; 90°C = THHN, THWN-2, XHHW-2, RHW-2.

Adjustment: more than 3 current-carrying conductors, Table 310.15(C)(1)
NumberFactor
4–680%
7–970%
10–2050%
21–3045%
31–4040%
41 and above35%
Ambient correction, 90°C column, Table 310.15(B)(1) (excerpt)
AmbientFactor
26–30°C (79–86°F)1.00
31–35°C (87–95°F)0.96
36–40°C (96–104°F)0.91
41–45°C (105–113°F)0.87
46–50°C (114–122°F)0.82
51–55°C (123–131°F)0.76
Counting current-carrying conductors (310.15(E), (F))
  • EGCs never count.
  • The neutral of a balanced 3-wire single-phase or 4-wire three-phase circuit, which carries only unbalanced current, does not count.
  • The neutral of a 4-wire, three-phase wye circuit counts when the major portion of the load is nonlinear (LED drivers, computers, VFDs).
  • The neutral of a 3-wire circuit derived from a 4-wire wye system (2 phases + neutral) counts.
Rooftops (310.15(B)(2))For raceways or cables exposed to sunlight on rooftops less than 7/8 in (23 mm) above the roof, add 33°C (60°F) to the ambient temperature. XHHW-2 conductors are exempt from this adder.
16

Wiring Methods

300.4 · 300.5 · 300.11 · 330 · 334 · 352 · 358ResidentialCommercial
Cables routed through wood studs during rough-inCables bored through framing (300.4)

Protect cables from nails and digging, and choose the right cable or conduit for the location.

1¼ inFrom stud edge, or add a steel plate
24 inBurial depth for UF cable
18 inBurial depth for PVC conduit
10 ftEMT support spacing
Show details, tables and figures

16.1 Protection against physical damage: 300.4

Wood stud (cross-section) NM ≥ 1¼ in NM Less than 1¼ in: steel plate ≥ 1/16 in thick required Finished face of stud ←
Figure 16-1. Bored holes in wood framing (300.4(A)(1)).
  • Bored holes in wood: edge of hole at least 1¼ in (32 mm) from the nearest edge of the framing member, or a steel nail plate at least 1/16 in thick.
  • Notches in wood: a steel plate is required over the notch, and the notch must not weaken the structure.
  • Metal studs (300.4(B)): NM cable through factory or field holes in metal members needs listed grommets or bushings.
  • Parallel to framing (300.4(D)): keep 1¼ in from the nearest edge, or protect the cable with a steel plate.
  • Under roof decking (300.4(E)): cables and raceways must be at least 1½ in below the lowest surface of metal-corrugated roof decking, which protects them from roofing screws.

16.2 Underground installations: 300.5

Finished grade 6 in RMC / IMC 12 in Dwelling 120 V, ≤ 20 A, GFCI 18 in PVC / nonmetallic raceway 24 in Direct-burial cable (UF, USE)
Figure 16-2. Minimum cover for general locations, Table 300.5(A).
  • Streets, roads, driveways, parking lots: 24 in for all methods. One- and two-family dwelling driveways allow 18 in for some methods; check the table.
  • Under a building: cables must be in a raceway. Under a 4 in concrete slab, the cover may be reduced.
  • Where conductors emerge from grade: protect them from the required depth (max 18 in) up to 8 ft above grade (300.5(D)(1)).
  • Warning ribbon: at least 12 in above underground service conductors buried 18 in or more that are not encased in concrete (300.5(D)(3)).
  • Wet location: the interior of underground raceways is a wet location, so use wet-rated conductors such as THWN-2 or XHHW-2 (300.5(B)). Seal raceways entering buildings (300.5(G)).

16.3 Common wiring methods compared

MethodTypical useKey rulesApplies to
NM cable (334)Dwellings, wood-frame buildingsPermitted in one- and two-family and multifamily dwellings, and in other structures of construction Types III, IV, and V (with limits). Not in wet or damp locations, or exposed in commercial dropped ceilings. Support every 4½ ft and within 12 in of boxes. Ampacity per the 60°C column (334.80).Res
MC cable (330)Commercial interiors, tenant fit-outsSupport every 6 ft and within 12 in of boxes (for 4 conductors or fewer, 10 AWG and smaller). Only the listed armor types (e.g., MCAP, HCF) qualify as the EGC.Com
EMT (358)Commercial, exposed or concealedSupport within 3 ft of each box or termination and every 10 ft. Maximum 360° of bends between pull points. Use compression fittings or raintight fittings in wet locations.Com
PVC (352)Underground, corrosive, outdoorSupport spacing per Table 352.30 (3 ft for ½–1 in, up to 8 ft for 6 in). Expansion fittings where the length change is ¼ in or more (352.44). Requires a separate EGC.Res Com
RMC / IMC (344/342)Services, exposed to damage, hazardous areasStrongest protection. Qualifies as an EGC. Minimum 6 in cover.Com
Support above suspended ceilings (300.11)Wiring above a suspended ceiling must be supported independently of the ceiling grid. Ceiling support wires may be used only if they are identified for the purpose and installed in addition to the ceiling's own support wires.
Part E · Grounding & Bonding
17

Service Grounding & Bonding

250.4 · 250.24 · 250.50–250.53 · 250.94 · 250.104ResidentialCommercial
Copper water piping in wall framingMetal water piping: bond per 250.104

Grounding connects to the earth; bonding makes breakers trip. Neutral and ground connect at the service only.

1 pointNeutral-to-ground bond
8 ftGround rod length
6 ftSpacing between two rods
20 ftRebar for a Ufer electrode
Show details, tables and figures

Grounding (connecting to earth) limits voltages from lightning, line surges, and contact with higher-voltage lines. Bonding (connecting metal parts together and back to the source) creates the low-impedance fault path that makes breakers trip. The earth is not an effective fault-current path (250.4(A)(5)).

SERVICE EQUIPMENT Neutral bar Ground bar Main bonding jumper (MBJ) Neutral + ground joined here only GEC rod ≥ 6 ft apart rod DOWNSTREAM PANEL Neutral bar Ground bar NO bond here Neutral isolated Ground bar → enclosure Neutral (white) EGC (green) 4-wire feeder
Figure 17-1. The neutral is bonded to ground only at the service. Downstream, the neutral and EGC remain separate (250.24(A)(5), 250.142(B)).

17.1 Grounding electrode system: 250.50, 250.52

All of the following electrodes that are present at the building must be bonded together to form the grounding electrode system:

ElectrodeQualifying conditions
Metal underground water pipeIn direct contact with earth for 10 ft or more. Must be supplemented by an additional electrode (250.53(D)(2)). Connect within the first 5 ft of entry into the building.
Metal in-ground support structureBuilding steel in direct contact with earth for 10 ft or more (with or without concrete encasement).
Concrete-encased electrode (“Ufer”)At least 20 ft of ½ in (No. 4) or larger rebar, or 4 AWG bare copper, encased in at least 2 in of concrete in direct contact with earth (footings). Must be used if present in a new building.
Ground ringAt least 20 ft of 2 AWG bare copper encircling the building, at least 30 in deep.
Rod and pipe electrodesAt least 8 ft long; rods at least ⅝ in diameter (½ in if listed). Driven to full depth, or at 45°, or buried in a 30 in trench.
Plate electrodesAt least 2 ft² of exposed surface, buried at least 30 in deep.
  • Single rod (250.53(A)(2)): a single rod, pipe, or plate electrode must be supplemented by a second electrode at least 6 ft away, unless it has a resistance to earth of 25 Ω or less.
  • Bonding of piping (250.104): metal water piping must be bonded (jumper sized per Table 250.102(C)(1)). Metal gas piping, including CSST, must be bonded per 250.104(B) and the manufacturer's instructions.
  • Intersystem bonding termination (250.94): provide a terminal with at least three connections, at the service, for communications, CATV, and similar systems.
  • Detached buildings (250.32): install a grounding electrode at the second building, run an EGC with the feeder, and do not bond the neutral to ground at the second building.
Common errorLeaving the factory bonding screw or strap installed in a downstream panelboard. This puts neutral current on the EGC, raceways, and enclosures, creating shock, fire, and EMI problems. Remove it in all panels except the service and the first disconnect of a separately derived system.
18

Transformers & Separately Derived Systems

250.30Commercial

Each transformer secondary is a new system. It needs its own neutral-to-ground bond and grounding electrode.

1 bondAt transformer OR first disconnect
SteelBuilding steel is the preferred electrode
250.66Table for GEC size
Show details, tables and figures

In most commercial buildings, a 480 V distribution system feeds step-down transformers that create local 208Y/120 V systems. Each transformer secondary is a separately derived system (SDS) and needs its own neutral-to-ground bond and grounding connection.

480 V panel primary OCPD 3 Ø + EGC Transformer 480 Δ – 208Y/120 X0 Gnd System bonding jumper (here OR at first disconnect, not both) Secondary 208Y/120 panel neutral isolated GEC (Table 250.66) Building steel or nearest water-pipe electrode (250.30(A)(4))
Figure 18-1. Grounding and bonding a separately derived system.
ElementRequirement
System bonding jumper, 250.30(A)(1)Connects the neutral (X0) to the EGC at one point only: at the transformer, or at the first system disconnecting means. Size per Table 250.102(C)(1), based on the largest secondary conductor.
Supply-side bonding jumper, 250.30(A)(2)Where the system bonding jumper is at the first disconnect, a supply-side bonding jumper is run with the secondary conductors to bond the transformer enclosure.
GEC, 250.30(A)(5), (6)Connects the neutral at the same point as the system bonding jumper to the grounding electrode. Size per Table 250.66. A common GEC (min. 3/0 Cu) with taps is permitted for multiple transformers.
Grounding electrode, 250.30(A)(4)Use the nearest of: building steel or the metal water pipe within 5 ft of entry, otherwise another 250.52 electrode.
Primary EGCRun with the primary feeder and sized per Table 250.122, based on the primary OCPD.
Common errorBonding X0 to ground at both the transformer and the secondary panel. This creates a parallel neutral path through the EGC and raceway. Choose one location and show it on the one-line diagram.
19

Sizing Grounding & Bonding Conductors

Tables 250.66 · 250.102(C)(1) · 250.122ResidentialCommercial
Grounding electrode system detail with GEC sizing tableGrounding detail with GEC sizing table

Ground wires are sized from tables: the EGC by breaker size, the GEC by service wire size.

12 AWGEGC for a 20 A circuit
10 AWGEGC for a 60 A circuit
6 AWGEGC for a 200 A feeder
6 AWGMax GEC to ground rods
Show details, tables and figures
ConductorTableBased on
Equipment grounding conductor (EGC)250.122Rating of the OCPD ahead of the circuit
Grounding electrode conductor (GEC)250.66Largest service or derived ungrounded conductor
Main / system bonding jumper, supply-side bonding jumper250.102(C)(1)Largest ungrounded supply conductor (12.5% rule above 1100 kcmil Cu)
Table 250.122, EGC (excerpt)
OCPD (A)CopperAl / CCA
151412
201210
60108
10086
20064
30042
40031
50021/0
60012/0
8001/03/0
10002/04/0
12003/0250
16004/0350
2000250400
Table 250.66, GEC (copper excerpt)
Largest ungrounded conductor (Cu)GEC (Cu)
2 AWG or smaller8 AWG
1 or 1/06 AWG
2/0 or 3/04 AWG
Over 3/0 – 350 kcmil2 AWG
Over 350 – 600 kcmil1/0
Over 600 – 1100 kcmil2/0
Over 1100 kcmil3/0
  • GEC limits (250.66(A)–(C)): to rods, pipes, or plates only, the GEC never needs to be larger than 6 AWG Cu. To a concrete-encased electrode only: 4 AWG Cu. To a ground ring only: the size of the ring.
  • Upsized conductors (250.122(B)): if the ungrounded conductors are increased in size (e.g., for voltage drop), the EGC must be increased proportionally by circular-mil area.
  • Parallel runs (250.122(F)): each parallel raceway or cable needs a full-size EGC based on the feeder OCPD.
  • Raceway as EGC (250.118): EMT, RMC, and IMC qualify as EGCs, but many specifications still require a separate wire-type EGC for reliability.
Part F · Boxes & Raceways
20

Box Fill & Box Support

314.16 · 314.27ResidentialCommercial
Device box installed in wall framing during rough-inDevice box at rough-in: check fill before trim

Count the wires, devices, and clamps, then make sure the box is big enough.

2Allowances per switch or receptacle
2.25 in³Per 12 AWG wire
50 lbCeiling box support
Show details, tables and figures

Overfilled boxes cause overheating, damaged insulation, and loose connections. Count the conductor allowances, multiply by the volume per conductor, and compare the result with the box volume (marked on the box, or from Table 314.16(A)).

Device = 2 allowances Cable 1 Cable 2 4 wires + 2 (device) + 1 (all EGCs) = 7
Figure 20-1. Two 12/2 cables to a receptacle, box without internal clamps.
Counting rules, 314.16(B)
ItemAllowance
Each conductor originating outside the box and terminating or spliced inside it1 each
Conductor passing through without splice or termination1
Conductors that do not leave the box (pigtails, jumpers)0
Internal cable clamps (all together)1
Luminaire studs / hickeys (each type)1
Each device yoke (switch, receptacle)2
All EGCs together (up to 4)1, plus ¼ for each additional EGC beyond 4
Volume per conductor, Table 314.16(B)
Size181614121086
in³1.501.752.002.252.503.005.00
Result for Figure 20-17 × 2.25 in³ = 15.75 in³. An 18 in³ single-gang box complies. In commercial work, a 4 in square × 2⅛ in deep box (30.3 in³) with a mud ring is typical. Include the volume of the extension ring or plaster ring only when it is marked with its volume.

Box support for luminaires and fans: 314.27

  • Ceiling outlet boxes for luminaires must support at least 50 lb. Heavier luminaires need marked boxes or independent support.
  • Wall-mounted luminaires over 50 lb need independent support.
  • Ceiling fans: boxes must be listed and marked for fan support (up to 70 lb, or marked for more). In dwellings, ceiling boxes in habitable rooms where a fan could be installed must be listed for fan support (314.27(C)).
  • Floor boxes must be listed for floor installation (314.27(B)).
21

Raceway (Conduit) Fill

Chapter 9 Tables 1, 4, 5 · Annex CResidentialCommercial
Raceways entering the bottom of a panelboardRaceways entering a panelboard: check fill

Leave room in the conduit so wires can be pulled without damage and stay cool.

40%3 or more wires
31%2 wires
53%1 wire
60%Nipples 24 in or shorter
Show details, tables and figures
1 conductor max 53% 2 conductors: max 31% 3 or more: max 40%
Figure 21-1. Maximum fill, Chapter 9 Table 1. The low limit for two conductors prevents jamming during the pull.
  1. Find the area of each conductor (in²) in Chapter 9, Table 5, by insulation type and size. Bare conductors are in Table 8.
  2. Add all conductor areas, including EGCs.
  3. Select the raceway from Chapter 9, Table 4 for the specific raceway type (EMT, PVC 40, PVC 80, RMC, etc.), using the 40% column.
Common THHN/THWN-2 areas (Table 5) and EMT 40% areas (Table 4), excerpt
THHN sizeArea (in²)EMT trade size40% area (in²)
12 AWG0.0133½ in0.122
10 AWG0.0211¾ in0.213
8 AWG0.03661 in0.346
6 AWG0.05071¼ in0.598
4 AWG0.08241½ in0.814
2 AWG0.11582 in1.342
1/00.18552½ in2.343
3/00.26793 in3.538
Shortcuts and exceptions
  • Where all conductors are the same size and insulation, Informative Annex C gives the maximum number directly.
  • Nipples (24 in or shorter) may be filled to 60%, and the bundling adjustment does not apply (Chapter 9, Note 4).
  • Remember that more than 3 current-carrying conductors also triggers ampacity adjustment (Section 15).
Part G · Equipment
22

Motors

Article 430CommercialResidential (pumps)
Equipment disconnect and control station mounted on a columnDisconnect and controls in sight of the machine

Motors draw a big surge when starting, so wire, breaker, and overload are each sized differently.

125%Wire, of table current
250%Max inverse-time breaker
115–125%Overload, of nameplate current
Show details, tables and figures

Motors draw 6–8 times their running current while starting. For this reason, Article 430 separates protection into short-circuit and ground-fault protection (the breaker or fuse, sized large enough to allow starting) and overload protection (sized close to the running current).

1. FLC from NEC tables 430.248 (1Ø) / 430.250 (3Ø) 2. Conductors ≥ 125% × FLC (430.22) 3. Breaker / fuse Table 430.52 (% of FLC) 4. Overload relay NAMEPLATE FLA × 115–125% Table FLC for conductors and OCPD; nameplate FLA for overloads
Figure 22-1. Motor branch-circuit sizing.
Table 430.52 (squirrel-cage, typical)
DeviceMax % of FLC
Inverse-time circuit breaker250%
Dual-element (time-delay) fuse175%
Non-time-delay fuse300%
Instantaneous-trip breaker (MCP)800% (1100% for Design B energy-efficient)
Table 430.250, 3Ø FLC (excerpt), amperes
HP208 V230 V460 V
516.715.27.6
1030.82814
1546.24221
2574.86834
5014313065
100273248124
  • Overloads (430.32): 125% of nameplate FLA for motors with a service factor of 1.15 or more, or a temperature rise of 40°C or less; 115% for all others.
  • Next size up: where the 430.52 value is not a standard rating, the next higher standard size is permitted (430.52(C)(1) Exc. 1). If the motor still cannot start, higher limits are allowed (Exc. 2).
  • Several motors on a feeder (430.24): 125% of the largest motor FLC + 100% of the other motors + other loads.
  • Disconnecting means (430.102): must be in sight of the controller and of the motor (in sight = visible and within 50 ft). A lockable disconnect at the controller may serve the motor in some cases. Disconnect rating ≥ 115% of FLC (430.110).
  • VFDs (430.122): conductors to the drive are sized at 125% of the drive's rated input current.
Common errorUsing nameplate amps to size conductors and breakers. 430.6(A)(1) requires the table FLC, because a motor may later be replaced with a different model.
23

Air-Conditioning & Refrigeration Equipment

Article 440 · 210.63ResidentialCommercial

Size air-conditioning circuits straight from the two numbers on the unit nameplate.

MCAWire must be at least this
MOCPBreaker must not exceed this
In sightDisconnect at the unit
25 ftService receptacle
Show details, tables and figures

For packaged HVAC equipment (condensers, heat pumps, rooftop units), the manufacturer has already done the motor calculations. Use the two values on the nameplate.

UNIT NAMEPLATE 208/230 V · 1 Ø · 60 Hz MIN. CIRCUIT AMPS (MCA): 26.4 MAX. FUSE / BKR (MOCP): 40 Wire ≥ MCA: 10 AWG Cu (30 A at 60°C) Breaker ≤ MOCP: 40 A max (30 or 35 A also OK)
Figure 23-1. Sizing from the nameplate (440.4(B), 440.22). Here a 40 A breaker on 10 AWG is permitted, because 240.4(G) refers to Article 440.
  • Conductors: ampacity ≥ MCA (minimum circuit ampacity).
  • OCPD: not greater than MOCP (maximum overcurrent protection). If the nameplate says “HACR breaker” or “fuse”, that type must be used.
  • Disconnect (440.14): within sight of and readily accessible from the equipment. It may be mounted on the unit, but not on panels that give access to the equipment or obscure the nameplate.
  • Service receptacle (210.63): within 25 ft, on the same level, GFCI protected outdoors and on rooftops.
  • Outdoor dwelling units: 210.8(F) GFCI for outdoor outlets. Coordinate with the equipment's listed compatibility (variable-speed compressors).
  • SCCR (440.10): the equipment's short-circuit current rating must be at least the available fault current. This is critical for commercial rooftop units close to the service.
24

Transformer Overcurrent Protection

450.3(B) · 240.21(C) · 240.4(F)Commercial
Pad-mounted transformer beside outdoor switchgearPad-mounted transformer

Protect the transformer with a primary breaker, and protect its secondary wires too.

125%Primary-only protection
250% / 125%Primary + secondary protection
10 / 25 ftSecondary conductor length rules
Show details, tables and figures
Table 450.3(B), transformers 1000 V and less (simplified)
Protection methodPrimary OCPD (max)Secondary OCPD (max)
Primary only125% of rated primary current (9 A or more; next size up permitted)Not required
Primary and secondary250% of rated primary current125% of rated secondary current (9 A or more; next size up permitted)
Three-phase current: I = kVA × 1000 / (V × 1.732) 75 kVA, 480 V primary: I = 75,000 / (480 × 1.732) = 90.2 A 75 kVA, 208 V secondary: I = 75,000 / (208 × 1.732) = 208.2 A

Secondary conductors: 240.21(C)

  • Conductor protection: transformer protection does not automatically protect the secondary conductors. Only 2-wire (single-voltage) secondaries and 3-wire delta-delta secondaries may be protected by the primary OCPD (240.4(F)). A 208Y/120 V secondary always needs secondary conductor protection.
  • 10-ft rule, (C)(2): secondary conductors up to 10 ft long, with ampacity not less than the rating of the device they terminate in.
  • 25-ft rule, (C)(6): up to 25 ft, where the secondary ampacity × (secondary-to-primary voltage ratio) is at least 1/3 of the primary OCPD rating, terminating in a single OCPD.
  • Outside, (C)(4): unlimited length outdoors, terminating in an OCPD at the building disconnect.
  • Ventilation (450.9): maintain the clearances marked on the transformer.
  • Accessibility (450.13): transformers must be accessible. Dry-type units 1000 V or less and 50 kVA or less may be installed above suspended ceilings or in hollow spaces under specific conditions.

See Example 28.3 for a complete 75 kVA transformer design.

25

Electric Vehicle Charging

Article 625 · 220.57 · 750ResidentialCommercial
Pedestal EV chargers in a parking areaEV chargers: one circuit each, sized at 125%

EV chargers are continuous loads, each on its own circuit sized at 125%.

125%Circuit sizing
48 → 60 ATypical home charger
GFCIAll EV charging receptacles
Show details, tables and figures
Panel 60 A 2-pole Individual branch circuit (625.40) sized at 125% (continuous, 625.42) EVSE 48 A output Vehicle 48 A × 1.25 = 60 A minimum circuit
Figure 25-1. EVSE branch circuit.
SectionRequirement
625.40Each EVSE outlet is supplied by an individual branch circuit with no other outlets.
625.42EVSE is a continuous load; size at 125%. Equipment with adjustable settings may be sized by its setting, if access to the adjustment is restricted.
625.43EVSE rated over 60 A or over 150 V to ground: a readily accessible disconnect, lockable in the open position.
625.54All receptacles installed for EV charging require GFCI protection.
220.57Dwelling and feeder load calculation: 7,200 W or nameplate, whichever is larger.
625.42(A) / 750Energy management systems (load management): the EV load on the service or feeder is the maximum the EMS permits, taken as a continuous load. Common in multifamily and workplace charging. See Topic 9A.

See Example 28.4 for a residential 48 A charger circuit.

26

Solar PV Systems & Interconnection

Article 690 · 705.11 · 705.12ResidentialCommercial

Solar back-feeds the panel, so the busbar must not be overloaded, and rooftop wiring must shut down quickly.

120%Busbar rule
Opposite endPV breaker location
30 sRapid shutdown time
600 VMax PV voltage on homes
Show details, tables and figures

26.1 Load-side connection: the 120% rule (705.12(B)(3)(2))

200 A bus 200 A main from utility 40 A PV Inverter Check: 200 + 40 = 240 A 120% × 200 = 240 A 240 ≤ 240: complies PV breaker at the opposite end of the bus from the main
Figure 26-1. The 120% rule.
Main OCPD + (125% × inverter rated output current) ≤ 120% × busbar rating (PV breaker located at the opposite end of the busbar from the main supply)

If the rule fails, the options are to downsize the main breaker, apply the “sum of breakers” method (705.12(B)(3)(3)), use a feed-through or center-fed configuration where permitted, use a power control system (705.13), or make a supply-side connection (705.11).

26.2 Key PV requirements

SectionRequirement
690.7Maximum PV system voltage is calculated using the lowest expected ambient temperature (temperature-corrected Voc). Limited to 600 V on one- and two-family dwellings; 1000 V on other buildings.
690.8Maximum circuit current = Isc × 125%. Conductors and OCPDs are sized at a further 125% (156% of Isc in total), unless the equipment is listed for 100% duty.
690.12Rapid shutdown for PV on buildings: conductors outside the array boundary ≤ 30 V within 30 s; inside the array ≤ 80 V within 30 s, or use a listed PV hazard control system.
690.13, 690.15PV system disconnecting means and equipment isolating devices.
705.10A permanent plaque or directory at the service equipment showing the location of all power sources.
706, 480Energy storage systems (batteries): separate article with disconnect, location, and spacing rules.
27

Emergency & Standby Power Systems

Articles 700 · 701 · 702 · 445CommercialResidential (702)
Large standby diesel generatorStandby generator set

Backup power must start quickly and, for life safety, stay separate from normal wiring.

10 sEmergency systems (700)
60 sLegally required standby (701)
InterlockHome generator back-feed protection
Show details, tables and figures
Normal (utility) Generator ATS listed for emergency Emergency panel egress lighting, exit signs Wiring kept independent of all other wiring (700.10) Load within 10 s (700.12)
Figure 27-1. Simplified emergency system.
ItemEmergency (700)Legally required standby (701)Optional standby (702)
Required byBuilding or life-safety code (egress lighting, exit signs, fire alarm)Code or authority (smoke control, sewage, communications)Owner's choice (homes, data, business continuity)
Transfer time10 seconds60 secondsNo requirement
Wiring separationEntirely independent of other wiring (700.10(B))May share raceways with general wiringNo requirement
Selective coordinationRequired (700.32)Required (701.32)Not required
TestingWitness test on installation; periodic testing and records (700.3)Witness test; periodic testing (701.3)Per manufacturer
Transfer equipmentAutomatic, listed for emergency useAutomatic, listedManual or automatic; must prevent back-feeding the utility (702.5)

Residential generators

  • Transfer equipment or a listed interlock kit is required to prevent back-feeding the utility (702.5). Never use a “suicide cord”.
  • Capacity: with manual transfer, the generator must carry the loads the user expects to run at the same time. With automatic transfer, it must carry the full calculated load, unless a load-management system is used (702.4(B)).
  • One- and two-family dwelling generators over 15 kW need an emergency shutdown device at a readily accessible outdoor location (445.18(D)).

Commercial systems

  • Separate emergency, legally required, and optional branches, each with its own transfer switch.
  • Selective coordination studies are required for 700 and 701 systems. Plan OCPD types early.
  • Unit equipment (battery packs) is permitted for egress lighting (700.12(I)), connected to the same branch circuit as the normal lighting in the area.
  • Generators that are separately derived (switched neutral) must be grounded per 250.30.
Part H · Reference
28

Worked Examples

Design practiceResidentialCommercial
Multifamily building and parking lotMultifamily project: service, EV and site lighting

Complete step-by-step designs you can follow and reuse.

150 A2,400 ft² house
150 A5,000 ft² retail store
75 kVA480 → 208Y/120 V transformer
60 A48 A EV charger
Show details, tables and figures

28.1 Single-family dwelling service: standard method Residential

Given: a 2,400 ft² house at 120/240 V, single-phase. Appliances: 12 kW range, 5 kW dryer, 4.5 kW water heater, 1.2 kW dishwasher, 0.9 kW disposal, 1.5 kW microwave (fastened in place), 10 kW electric heat, and a 5 kVA A/C unit.

StepCalculationVA
General lighting (220.41)2,400 ft² × 3 VA7,200
Small-appliance circuits (220.52(A))2 × 1,5003,000
Laundry circuit (220.52(B))1 × 1,5001,500
Subtotal11,700
Demand (Table 220.45)3,000 × 100% + 8,700 × 35% = 3,000 + 3,0456,045
Fixed appliances (220.53)(4,500 + 1,200 + 900 + 1,500) × 75%6,075
Dryer (220.54)5,000 W or nameplate, whichever is larger5,000
Range (Table 220.55, Col. C)12 kW range8,000
Heat vs. A/C (220.60)Larger of 10,000 (heat) and 5,000 (A/C)10,000
Largest motor (220.50, 430.24)25% × 900 VA disposal (A/C not counted, since heat governs)225
Total calculated load35,345
I = 35,345 VA ÷ 240 V = 147.3 A → minimum 150 A service Using 310.12 (83%): 150 A × 0.83 = 124.5 A → 1 AWG Cu or 2/0 Al (75°C) GEC (Table 250.66): 1 AWG Cu service conductors → 6 AWG Cu
Result: 150 A service minimum (a 200 A service is usually provided for future loads such as EV charging), with an SPD (230.67) and an outdoor emergency disconnect (230.85).

28.2 Small retail store service Commercial

Given: a 5,000 ft² retail store at 208Y/120 V, 3-phase, 4-wire. 30 linear ft of show window, 40 general receptacles, one sign circuit, and a rooftop unit with an 18,000 VA nameplate load.

LoadCalculationVA
General lighting (Table 220.42(A))5,000 × 1.9 = 9,500 × 125% (continuous)11,875
Show window (220.43(A))30 ft × 200 VA = 6,000 × 125%7,500
Receptacles (220.14(I), 220.44)40 × 180 = 7,200 (first 10 kVA at 100%)7,200
Sign (220.14(F))1,200 × 125%1,500
HVAC rooftop unitBased on nameplate MCA (MCA already includes 125% of the largest motor, 440.33)18,000
Total46,075
I = 46,075 VA ÷ (208 V × 1.732) = 127.9 A Select a 150 A service → 1/0 Cu THWN-2 (150 A @ 75°C) per phase + neutral EGC / GEC: GEC per Table 250.66 for 1/0 Cu → 6 AWG Cu Also: field-mark available fault current (110.24); check SCCR/AIC of equipment
Result: 150 A, 208Y/120 V, 3Ø, 4-wire service with 1/0 Cu conductors. The neutral may be sized from the 220.61 neutral calculation.

28.3 75 kVA transformer: 480 V Δ to 208Y/120 V Commercial

  1. Currents: primary 90.2 A; secondary 208.2 A.
  2. Primary OCPD: using primary and secondary protection, the maximum is 250% × 90.2 = 225 A. A practical design uses about 125% × 90.2 = 112.8 A, so select 125 A (check transformer inrush).
  3. Primary conductors: 125 A at 75°C → 1 AWG Cu (130 A). EGC per Table 250.122 for 125 A → 6 AWG Cu.
  4. Secondary OCPD: maximum 125% × 208.2 = 260 A. Select 250 A (the secondary panel main breaker or a separate disconnect).
  5. Secondary conductors: 250 A at 75°C → 250 kcmil Cu (255 A). Keep the length ≤ 10 ft (240.21(C)(2)) or meet the 25-ft rule.
  6. Grounding: system bonding jumper and GEC per Tables 250.102(C)(1) and 250.66, based on 250 kcmil Cu → 2 AWG Cu, connected to building steel (250.30(A)(4)).
  7. Working space: the 480 V primary terminals are 277 V to ground → 3 to 4 ft depending on the condition (110.26).
Result: 125 A primary breaker with 1 AWG Cu + 6 AWG EGC; 250 A secondary main with 250 kcmil Cu; 2 AWG Cu bonding jumper and GEC.

28.4 EV charger in a residential garage Residential

  1. Load: 48 A EVSE, continuous (625.42) → 48 × 1.25 = 60 A.
  2. OCPD: 60 A, 2-pole (standard size, 240.6(A)).
  3. Conductors: 75°C terminals → 6 AWG Cu (65 A). With 60°C terminals, 6 AWG is only 55 A, so 4 AWG Cu (70 A) would be needed (110.14(C)).
  4. EGC: Table 250.122 for 60 A → 10 AWG Cu.
  5. Voltage drop at 40 ft: 2 × 12.9 × 48 × 40 ÷ 26,240 = 1.9 V (0.8%) → acceptable.
  6. Raceway: 2 × 0.0507 + 0.0211 = 0.1225 in² → ¾ in EMT (0.213 in² at 40%).
  7. Service check: add 7,200 W or the nameplate rating (11,520 W) to the dwelling load calculation (220.57). Use the larger value: 11,520 W.
Result: 60 A 2-pole breaker, 2 × 6 AWG Cu THHN + 10 AWG Cu EGC in ¾ in EMT.
Q

Quick Reference

Key valuesResidentialCommercial
TopicValueSection
Working space depth3 ft (≤ 150 V); 3 / 3½ / 4 ft (151–600 V)Table 110.26(A)(1)
Working space width / height30 in or equipment width / 6½ ft110.26(A)(2), (3)
Dedicated equipment spaceEquipment footprint, up to 6 ft above the equipment110.26(E)
Two exits from working space≥ 1200 A and over 6 ft wide110.26(C)(2)
Panic hardware on doors≥ 800 A, door within 25 ft110.26(C)(3)
OCPD / switch handle height≤ 6 ft 7 in (2.0 m)240.24(A), 404.8
Continuous load≥ 3 h → 125%210.20, 215.3, 230.42
Small conductors (Cu)14 → 15 A; 12 → 20 A; 10 → 30 A240.4(D)
Next size upPermitted up to 800 A240.4(B)
Dwelling lighting load3 VA/ft²220.41
Receptacle load (non-dwelling)180 VA each; first 10 kVA at 100%, remainder 50%220.14(I), 220.44
Dwelling service minimum100 A230.79(C)
Dwelling service conductors83% of rating310.12
Maximum service disconnects6230.71
GFPE at the service≥ 1000 A, wye over 150 V to ground230.95
Arc energy reduction≥ 1200 A240.87
Receptacle spacing (dwelling)6 ft / 12 ft; countertop 24 in / 48 in210.52
HVAC service receptacleWithin 25 ft, same level210.63
Bundling adjustment4–6: 80%; 7–9: 70%; 10–20: 50%310.15(C)(1)
Ground rod8 ft; second rod ≥ 6 ft away unless ≤ 25 Ω250.52, 250.53
Concrete-encased electrode20 ft of ½ in rebar or 4 AWG Cu250.52(A)(3)
Conduit fill53% / 31% / 40%; nipples 60%Ch. 9, Table 1
Box fill (12 AWG)2.25 in³ per allowance314.16(B)
Burial coverRMC 6 in; PVC 18 in; UF 24 inTable 300.5(A)
Bored holes in framing1¼ in from edge, or 1/16 in steel plate300.4(A)
Motor conductors / breaker125% FLC / ≤ 250% FLC (inverse-time)430.22, 430.52
Transformer (primary + secondary)Primary ≤ 250%; secondary ≤ 125%450.3(B)
EV load (dwelling calc)7,200 W or nameplate220.57
PV 120% ruleMain + 1.25 × inverter ≤ 1.2 × bus705.12(B)(3)(2)
Emergency transfer time10 s (700); 60 s (701)700.12, 701.12
!

Disclaimer

This reference is an independent, simplified summary written for training purposes. It is not a reproduction of, or a substitute for, NFPA 70®, National Electrical Code®, 2023 Edition, which is a copyrighted publication of the National Fire Protection Association. Many requirements include exceptions and conditions that are omitted here for clarity, and table values are excerpts. Always verify requirements against the official code text, the edition adopted in your jurisdiction, and any local amendments, and consult the Authority Having Jurisdiction. Designs must be prepared and reviewed by qualified, licensed professionals. NEC® and National Electrical Code® are registered trademarks of the NFPA.